6.3 START UP

 
•  Before start up, satisfy of conditions of 6.2.1 and 6.2.2
•  Make sure that all equipments, except transformer, are adjusted max value of voltage or 
    current and choosen properly.
•  All electrical connection must be checked by authorized personnel.
•  Safety zone must be allocated while energizing transformer and all living creatures must be 
    taken out of zone.
•  First energizing of the transformer must be operated off-load. After inspecting the usual 
    conditions of noise level, temperature and oil level; the transformer would be loaded.

7. OPERATING AND MAINTENANCE

Transformers do not require any particular maintenance. However, to guarantee good operation, 

a few periodic checks should be carried out as follows.

•  Oil level and oil leakage should be observed periodically. In case any decrease in oil level,

  - If transformer is conservator type; refined oil with the same specifications should be added. 

   Oil leakage must be prevented with proper procedure.

  - If transformer is hermetically sealed, the manufacturer should be informed as soon as possible.

•  Dehydrating breather should be checked; in case of malfunctioning, it must be replaced. (for  

   conservator type transformers)

•  Buchholz Relay should be checked periodically. If there is gas accumulation, it must be    

  released after the reason is detected. Functions of relay should be controlled annually.

•  Oil temperature should be checked through thermometer; if there is overheating, reasons 

    should be detected.

•  Grounding resistance should be checked annually. (It must not exceed 5 Ω.)

•  Maintenance and inspections should be carried on while transformer is de-energized.

•  Bushings always should be cleaned and their physical status should be properly checked.

•  In case of breaks and cracks in bushings, please contact with the manufacturer for  

   

   replacement. Bushing should be stocked in vertical position and dry conditions.

Ulusoy Distribution Transformers Maintenance, Operation, Installation and Instruction Manual 

Summary of Contents for Ulusoy

Page 1: ...Ulusoy Distribution Transformers Maintenance Operation Installation and Instruction Manual www eaton com...

Page 2: ...ary assistance to the maintenance personnel to facilitate a periodic inspection of the transformer and to indicate the steps that they should follow to effect a more detailed examination of the active...

Page 3: ...n imminently hazardous situation which if not avoided will result in death serious personnel injury and property damage WARNING indicates a potentially hazardous situation which if not avoided could r...

Page 4: ...an be used to lift the entire equipment Under no circumstances may moisture be allowed to penetrate into the transformer For hermetically sealed transformers both those with gas cushions and those wit...

Page 5: ...HV or low voltage LV insulators to guide the transformer when moving it During the transport or the handling it is recommended to use only the special lifting eyes and tow attachments Angle between t...

Page 6: ...of individual pieces WARNING Unless indicated otherwise storage temperature must be between 25C and 50C Monitoring and checking the transformers during storage Preferably only fully assembled liquid f...

Page 7: ...nical Connections Decide and choose the cable cross section according to the system current and voltage Be sure that the surfaces are clean Dirty surfaces may cause isolation and contact problems 6 IN...

Page 8: ...and nut in 8 8 steel C Cover frame Bolt and nut in stainless steel pitch 60mm cork gasket pitch 90mm nbr gasket D Busbar bushings Fixing on cover Top piece onto bottom piece 5 4 6Nm 20 25Nm 20 25Nm 8...

Page 9: ...2 Table 2 Outdoor Electrical Clearance Un H V side voltage of rated level All clearances are in mm Electrical clearances are given for 1000m After 1000m till 3000m each 100m distance must be increase...

Page 10: ...pecifications should be added Oil leakage must be prevented with proper procedure If transformer is hermetically sealed the manufacturer should be informed as soon as possible Dehydrating breather sho...

Page 11: ...3 5 Years Conservation Tank Oil Leakage Every 2 Years Annually Oil Oil Dielectric Test All periodical controls are listed as a table below Table 3 Periodical Check Pressure relief device T 10 must ne...

Page 12: ...w Oil Sample Desired Value New Oil Filling Transformer Oil Sample Desired Value Oil Sample From Operating Transformer Proper Must Be Removed Pcb Analysis ASTM D 4059 ppm NA NA 50 50 Test Name Method U...

Page 13: ...sformers Current transformer Winding temperature indicator With and without contact thermometer 8 ACCESSORIES 8 1 STANDARD COMPONENTS AND ACCESSORIES Rating plate HV porcelain bushing LV porcelain bus...

Page 14: ...sampling of gases and of oil from oil filled electrical equipment and for the analysis of free and dissolved gases IEC 60599 Mineral oil impregnated electrical equipment in service Guide to the inter...

Page 15: ...about the surface protection quality paint of the transformer 7 Is there any oil leakage on the transformer Invalid for dry type distribution transformers 8 Is there any conspicuous point at which you...

Page 16: ...90 312 502 06 63 Eaton s mission is to improve the quality of life and the environment through the use of power management technologies and services We provide sustainable solutions that help our cust...

Reviews: