6
PLACING THE FUSES IN THE SWITCHGEAR
SWITCH OFF THE EARTHING
DISCONNECTOR AND OPEN THE
CELL FRONT COVER.
ASSEMBLE THE MEDIUM
VOLTAGE FUSE BY PLACING IT
IN A WAY THAT THE ARROW
DIRECTS INSIDE THE FUSE
PLUG. ENSURE THAT ITS CLAMP
IS TIGHT.
CHECK IF THE FUSE BLOW
ASSEMBLY ON THE FUSE PLUG
IS ON THE ARROW DIRECTION
ACCORDING TO THE PLASTIC
PIECE.
IF THE WARNING LIGHTS ON
THE SIGNAL LIGHT BOX ARE
ON, RESET THE SITUATION BY
PRESSING DELETE BUTTON AND
COMPLETE THE PROCEDURE.
CLOSE THE CELL DOOR AFTER
FINISHING THE PROCEDURE.
AFTER PLACING THE MEDIUM
VOLTAGE FUSE INTO THE SHELL,
PLACE IT IN THE SHELL BY
FIXING THE FUSE PLUG.
AFTER PLACING THE FUSE PLUG
INTO THE SHELL, ROTATE RIGHT
AND PLACE THE PAWLS ON THE
SHELL TO THE HOUSING ON THE
SHELL TUBE.
TURN THE FUSE PLUG LEFT.
REMOVE THE PLUG INSIDE
THE FUSE SHELL FROM THE
HOUSING.