background image

S611 Soft Starter

S611 Soft Starter

    MN03901003E—January 2012    www.eaton.com

i

Disclaimer of Warranties and Limitation of Liability 

The information, recommendations, descriptions and safety notations in this document are 
based on Eaton Corporation’s (“Eaton”) experience and judgment and may not cover all 
contingencies. If further information is required, an Eaton sales office should be consulted. 
Sale of the product shown in this literature is subject to the terms and conditions outlined in 
appropriate Eaton selling policies or other contractual agreement between Eaton and the 
purchaser.

THERE ARE NO UNDERSTANDINGS, AGREEMENTS, WARRANTIES, EXPRESSED OR 
IMPLIED, INCLUDING WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE OR 
MERCHANTABILITY, OTHER THAN THOSE SPECIFICALLY SET OUT IN ANY EXISTING 
CONTRACT BETWEEN THE PARTIES. ANY SUCH CONTRACT STATES THE ENTIRE 
OBLIGATION OF EATON.  THE CONTENTS OF THIS DOCUMENT SHALL NOT BECOME 
PART OF OR MODIFY ANY CONTRACT BETWEEN THE PARTIES. 

In no event will Eaton be responsible to the purchaser or user in contract, in tort (including 
negligence), strict liability or otherwise for any special, indirect, incidental or consequential 
damage or loss whatsoever, including but not limited to damage or loss of use of equipment, 
plant or power system, cost of capital, loss of power, additional expenses in the use of 
existing power facilities, or claims against the purchaser or user by its customers resulting 
from the use of the information, recommendations and descriptions contained herein. The 
information contained in this manual is subject to change without notice. 

Cover Photo: S611 Soft Starter

www.comoso.com

Summary of Contents for S611

Page 1: ...S611 Soft Starter Quick Start Installation Guide Effective January 2012 Supersedes June 2011 www comoso com...

Page 2: ...www comoso com...

Page 3: ...MERCHANTABILITY OTHER THAN THOSE SPECIFICALLY SET OUT IN ANY EXISTING CONTRACT BETWEEN THE PARTIES ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON THE CONTENTS OF THIS DOCUMENT SHALL NOT BECO...

Page 4: ...E 386 2273 8 00 a m 6 00 p m EST FAX 800 752 8602 After Hours Emergency 800 543 7038 6 00 p m 8 00 a m EST If you are in the U S or Canada and have OI or PLC questions you can take advantage of our to...

Page 5: ...tarter Do not attempt to lift the soft starter by the cover only Lug Installation Install the lugs below the bus bar to assure anti rotation Refer to figure Lug and Bolt Torque Support on this page Po...

Page 6: ...ze Number of Conductors Mechanical Lug Ilsco Part Number Torque lb in Mechanical Lug Range Soft Starter Catalog Number Mechanical Lug Eaton Catalog Number 52A 6 AWG 1 TA 2 0 120 14 AWG 2 0 S611A052XXX...

Page 7: ...ting Hole Dimensions Approximate Dimensions in mm Inches Frames A through D Frames E and F 70 0 2 76 464 7 18 30 110 0 4 33 10 0 0 39 70 0 2 76 80 0 3 15 90 0 3 54 80 0 3 15 155 0 6 10 562 0 22 13 10...

Page 8: ...ive L Permissive N Start L Start N Reset L Reset Reset E Stop Maintained Momentary Comms Adapter Comms Modbus TB4 DeviceNet Modbus PROFIBUS TB5 Module Ground 24V D0 D1 Common N Tap Neutral L Tap Line...

Page 9: ...on Operation LED list Navigates through display parameter list in Monitor mode Edit Save Selects Saves parameter values in Protection Operation modes Selects Advanced Con g Menu parameters Selects Sav...

Page 10: ...rt time elapses Verify that the motor is not overloaded After suitable performance has been achieved with either method determine the starting time to bypass and set Soft Start Time at 1 25 times this...

Page 11: ...45 67 Default value 36 60 33 57 Wye delta equivalent 27 52 19 44 Minimum for current limit 14 37 9 30 1 10 Minimum Application t Start t Stop u Start Breakaway Torque Remarks Crusher empty at start 20...

Page 12: ...ch network controller verify that the unit is recognized by the system controller Comms Port B adapter module failed or disconnected 15 Power Pole Over Temperature SCR temperature is above limits Oper...

Page 13: ...Incoming AC line voltage below trip threshold Incorrect mains supply voltage Connect to correct supply voltage Verify that mains voltage is within acceptable values Verify Motor Rated Voltage in the...

Page 14: ...imbalance problem with mains Increase the Voltage Fault Imbalance parameters Disable the fault if the other issues cannot be resolved 33 Jam Soft starter in bypass Motor below rated RPM and or current...

Page 15: ...www comoso com...

Page 16: ...liable efficient and safe power is available when it s needed most With unparalleled knowledge of electrical power management across industries experts at Eaton deliver customized integrated solutions...

Reviews: