Instruction Book 

IB182071EN

July 2018

Remote Power Racking System

(RPR-2)

www.eaton.com

APPENDIX A:       

 

 

 

ITE-HK AIR CIRCUIT BREAKER

A.1   INSERTION PROCEDURE USING THE RPR-2 

1)    Follow all procedures defined by company’s Personal Protective 

Equipment and Safety policy. Follow all precautions and 

requirements listed in the circuit breaker IB for racking the 

breaker.

2)    Move the RPR-2 unit in front of the switchgear cell. Open 

the cell door to allow for access to the rotary type racking 

mechanism of the breaker. If the cell has closed door racking 

capability, insert the racking adaptor through the provided 

opening with the cell door closed.

3)    Verify that the power circuit breaker is open and ready to be 

racked in from the correct position. The position depends 

on what type of power circuit breaker is being inserted. 

This position is determined by the ability to rack in the given 

power circuit breaker from the position that it can be racked 

completely into the Connected position without needing any 

adjustments (foot pedal pressed etc.). This is the Test position 

for HK breakers.

4)    If engaged, release the Transport Latch to allow for vertical 

movement of the Power Module. (Figure 3.3)

5)    Turn on the Powerware UPS for the RPR-2 by pressing the  

On button for approximately five seconds and allow for the 

unit to initialize. (Figure 4.5) For all other menu settings and 

features, please refer to the UPS instruction CD.

6)    Turn on the power to the Power Module with the Power 

Switch. (Figure 3.6)

7)    Select the correct breaker program on the Power Module by 

pressing and releasing the Breaker Select Button until the 

desired program is displayed on the Fusion Controller. (Figure 

4.1)

8)    Select the INSERT direction with the Insert/Remove switch. 

(Figure 4.1)

9)    Select the correct racking adaptor for the breaker being 

inserted. (Figure 3.1)  Place the racking adaptor on the breaker’s 

racking mechanism shaft. Position the RPR-2 shaft with the 

racking adaptor. Turn the Insertion Shaft Lock to Unlatched 

position to allow for connection the RPR-2 into the racking 

adaptor on the power circuit breaker. (Figure 3.6)  An extension 

can be used if a longer length is needed. If necessary, the Jog 

button (Figure 3.6) can be pressed to rotate the shaft for correct 

alignment (amber pendant and tower light will illuminate). 

Horizontal alignment can be achieved with the casters and 

vertical alignment by raising or lowering the Power Module. 

(Figure 4.2)

10)    Once the RPR-2 is connected, properly adjust the unit toward 

the cell to insure the proper amount of travel is available for 

the power circuit breaker insertion process. When an adequate 

amount of travel distance is achieved, the green tower light will 

illuminate. 

11)    Engage the foot brake on the RPR-2 truck by stepping down 

on the lever. (Figure 4.6)  Verify that the correct power circuit 

breaker program and the Insert direction are selected by 

viewing the LCD screen on the Fusion Controller (Figure 4.1).

m

 WARNING

SELECTION OF THE INCORRECT POWER CIRCUIT BREAKER PROGRAM MAY 

RESULT IN THE RPR-2 UNIT SIGNALING COMPLETION OF THE INSERTION 

CYCLE WITH THE POWER CIRCUIT BREAKER ONLY PARTIALLY INSERTED.

12)    In order to start racking the HK air breaker, the racking shaft 

interlock must be held aside. Do this by holding the interlock 

paddle aside while pressing and holding the RPR-2 Jog button 

for the duration of one cycle. (Figure A.1)  this will turn the 

breakers racking shaft far enough to hold the interlock paddle 

aside.

13)    Take the Pendant and move a safe distance away from 

front of the power circuit breaker. (The distance should be 

predetermined through Arc Flash calculations.)

14)    When area is clear, depress and hold the Insert button (white 

with black arrow) on the pendant. (Figure 4.3)  This will initiate 

the insertion process on the RPR-2 unit. The amber light on the 

pendant and on the tower light will illuminate while the power 

circuit breaker is in the insertion process. 

Note:

N

If ao any oimt during oht instroiNn prNctss oht Instro buooNn is 

rtltastd, oht oNwtr lighos and ptndano ligho will nNo bt illuminaotd.

15)    When the power circuit breaker is in the Connected position, 

the red tower light will illuminate and the amber light on the 

pendant will turn off. This indicates that it is now safe to 

approach the power circuit breaker.

m

 WARNING

IF AT ANY TIME DURING THE INSERTION PROCESS AN OVER-TORQUE 

OCCURS THE AMBER LIGHT ON THE PENDANT AND TOWER WILL FLASH. 

(THE AUTO REVERSE SELECTION IS NOTED ON THE NAMEPLATE OF THE 

RPR-2 UNIT.)

• IF THE AUTO-REVERSE FUNCTION IS SELECTED IN THIS SITUATION 

THE RPR-2 WILL THEN INITIALIZE THE REMOVAL PROCESS. ONCE THIS 

PROCESS IS COMPLETED THE GREEN AND AMBER LIGHTS ON THE 

LIGHT TOWER WILL FLASH AND THE AMBER LIGHT ON THE PENDANT 

WILL TURN OFF INDICATING IT IS SAFE TO APPROACH THE POWER 

CIRCUIT BREAKER. 

Figurt A.1. InotrlNck Paddlt Htld Asidt and JNg BuooNn Prtsstd 

TN Soaro ITE-HK Racking PrNctss

Summary of Contents for RPR-2

Page 1: ...July 2018 Instruction Book IB182071EN Remote Power Racking System RPR 2 Supercedes October 2013 Effective RPR 2 Low Profile Shown...

Page 2: ...ffice should be consulted Sale of the product shown in this literature is subject to the terms and conditions outlined in appropriate Eaton selling policies or other contractual agreement between Eato...

Page 3: ...POWER MODULE REMOVAL 13 5 3 REMOVING UPS MODULE FROM RPR 2 DEVICE 14 5 4 REPLACEMENT OF THE UPS MODULE BATTERIES 15 SECTION 6 REPLACEMENT PARTS 16 6 1 GENERAL 16 6 2 ORDERING INSTRUCTIONS 16 APPENDIX...

Page 4: ...ls of Arc Flash can be bulky hot and uncomfortable This may dissuade personnel from wearing proper protection The best way to limit exposure to Arc Flash during the process of racking power circuit br...

Page 5: ...RPR 2 Plus Dimensions Profile Type Overall Height Stanchion Height Max Racking Height Min Racking Height Width Depth 360o Rotational Clearance A B C D E F G RPR 2 Universal Profile 100 98 81 4 875 28...

Page 6: ...Safety Code who are familiar with the installation and maintenance of power circuit breakers and equipment should be permitted to insert or remove power circuit breakers Read these instructions carefu...

Page 7: ...ter from sun rain snow corrosive fumes dust dirt falling objects excessive moisture etc must be provided If the building is not heated containers should be arranged to permit free circulation of air o...

Page 8: ...ile External View of RPR 2 Profile External View of RPR 2 Univeral Profile Shown 1 Stanchion 5 UPS Power Cable 9 Counterweight Cable 2 Status Light Tower 6 Jog Button 10 Power Module Cable 3 Control P...

Page 9: ...t Front External View 1 Transport Latch 4 Insertion Shaft Lock 7 Nameplate 2 Computer Access Port 5 Power Switch 8 Foot Brake 3 Power Cable 6 Pendant Connection Port Rear External View 1 Control Penda...

Page 10: ...re 3 6 7 The choice of the perf a torque will be dependent on the breaker that is being racked The PT 50 will be used on all medium voltage circuit breakers and the PT 30 will be used on all the low v...

Page 11: ...Flash calculations 13 When area is clear depress and hold the Insert button white with black arrow on the pendant Figure 4 3 This will initiate the insertion process on the RPR 2 unit The amber light...

Page 12: ...ch To turn off the UPS press and hold the Off button for approximately five seconds 20 Lower the Power module to the lowest position and engage the Transport Latch Figure 3 3 The pendant can be stored...

Page 13: ...rmal operation If it is necessary to replace the Power Module UPS system or other components the representative will initiate an express air shipment that typically arrives within 48 hours after the P...

Page 14: ...o remove it from the UPS sleeve Figure 5 6 Figure 5 4 Removing UPS Retaining Bracket x4 Figure 5 5 Disconnecting 120V Power Supply From UPS Module Figure 5 8 Unpluging UPS Module Figure 5 6 Removing U...

Page 15: ...r local recycling or hazardous waste center for the information on proper disposal of the used batteries m WARNING DO NOT DISPOSE OF BATTERY OR BATTERIES IN A FIRE EXPLOSION MAY OCCUR PROPER DISPOSAL...

Page 16: ...omer depending upon the service severity and continuity requirements Each customer should develop his own level based on operating experience 6 2 ORDERING INSTRUCTIONS a Always specify all information...

Page 17: ...he casters and vertical alignment by raising or lowering the Power Module Figure 4 2 10 Once the RPR 2 is connected properly adjust the unit toward the cell to insure the proper amount of travel is av...

Page 18: ...If necessary the Jog button Figure 3 6 can be pressed to rotate the shaft for correct alignment amber pendant and tower light will illuminate Horizontal alignment can be achieved with the casters and...

Page 19: ...igure 3 6 An extension can be used if a longer length is needed If necessary the Jog button Figure 3 6 can be pressed to rotate the shaft for correct alignment amber pendant and tower light will illum...

Page 20: ...Unlatched position to allow for connection the RPR 2 into the racking adaptor on the power circuit breaker Figure 3 6 An extension can be used if a longer length is needed If necessary the Jog button...

Page 21: ...ct breaker program on the Power Module by pressing and releasing the Breaker Select Button until the desired program is displayed on the Fusion Controller Figure 4 1 8 Select the INSERT direction with...

Page 22: ...tion in the switchgear The control box has magnets to allow easy attachment to the switchgear Figure C 8 19 Connect the motor plug from the vertical control box into the switchgear female motor connec...

Page 23: ...onnector 23 Pull back the racking handle in the racking adapter housing and latch it to the housing If needed adjust the handle to ensure proper engagement of the clutch handle Figure C 12 24 Once the...

Page 24: ...t breaker program and the Insert direction are selected by viewing the LCD screen on the Fusion Controller Figure 4 1 m WARNING SELECTION OF THE INCORRECT POWER CIRCUIT BREAKER PROGRAM MAY RESULT IN T...

Page 25: ...for the power circuit breaker insertion process When an adequate amount of travel distance is achieved the red tower light will illuminate 11 Engage the foot brake on the RPR 2 truck Verify that the c...

Page 26: ...ulevard Cleveland OH 44122 United States Eaton com 2018 Eaton All Rights Reserved Printed in USA Publication No IB182071EN July 2018 Eaton is a registered trademark All trademarks are property of thei...

Reviews: