34008235EN/AC - Page 12
2. Installation
2.6 Equipment connections
Check that the indications on the name plate located on the back of the UPS correspond to the AC-power source
and the true electrical consumption of the total load.
1 - Disconnect the supply cable
(1)
(not
supplied) of the equipment.
2 - Connect the cable to socket
(2)
, then to
the AC-power source.
3 - Connect the loads to the UPS using the
cables
(17)
.
It is preferable to connect the priority loads
to the two outlets marked
(3)
and the non-
priority loads to the two programmable
outlets marked
(5)
(1 and 2).
To program shutdown of outlets
(5)
during
operation on battery power and thus
optimise the available backup time, the
EATON communication software is
required.
(1) Cable characteristics: 250 V - 10 A (CSA
1mm
2
, type HO5).
Fit the connection securing system.
(rack model only).
4 - Fit the connection securing system
(23)
that prevents the plugs from being pulled
out accidentally.
Note.
The UPS charges the battery as soon as it is connected to the AC-power source, even if button
(10)
is not
pressed.
Once the UPS is connected to the AC-power source, eight hours of charging are required before the battery can
supply the rated backup time.
24
17
23
17
Summary of Contents for Pulsar Evolution 1150/1150 Rack 1U
Page 2: ...34008235EN AC Page 2...
Page 21: ...34008235EN AC Page 21 Notes...
Page 22: ...34008235EN AC www eaton com...