TIE CABINET INSTALLATION
Eaton 9355 Tie Cabinet (20/30 kVA) Installation Guide
S
164201630 Rev D
www.eaton.com/powerquality
12
Jumpers
(remove three
wires for
dual-feed)
Input Terminal
Block
L1, L2, L3, N, N
Output Terminal
Block
L1, L2, L3, N, N
Remote DC
(battery)
DC +, DC –
Maintenance
Bypass Auxiliary
Contacts (TB4)
Ground
TB4
Figure 6. UPS Terminal Block
NOTE
The two input neutral terminals are jumpered together; use either one of these terminals to make
the input neutral connection.
NOTE
The two output neutral terminals are jumpered together; use either one of these terminals to make
the output neutral connection.