![Eaton Powerware 9170+ UPS 3-18 kVA User Manual Download Page 68](http://html1.mh-extra.com/html/eaton/powerware-9170-ups-3-18-kva/powerware-9170-ups-3-18-kva_user-manual_4271081068.webp)
BATTERY CABINET INSTALLATION
Eaton 9170
+
UPS (3–18 kVA) User's Guide
S
164201393 Rev E
www.eaton.com/powerquality
62
Entrance Panel
Battery Cable
Figure 42. UPS Power Entrance Panel
3.
Use a pair of pliers to bend the narrow links (1 and 2 in Figure 43)
between the outer edge of the lower breakaway panel and the rear
panel.
4.
Use the pliers to bend the entire breakaway panel (at 3 and 4 in
Figure 43) until it breaks away.
1
2
3
4
Figure 43. Breakaway Panel Links
5.
Verify all hazardous voltages have been removed from the
backplane by testing with a voltmeter or other test device.