
UPS MAINTENANCE
Eaton 5125 Tower UPS (1000–2200 VA) User's Guide
S
05147304 Rev C
www.eaton.com/powerquality
46
How to Replace Extended Battery Modules
To replace the Extended Battery Modules (EBMs):
1.
Unplug the EBM cable from the UPS.
If additional EBMs are installed, unplug the EBM cable from the
battery connector on each EBM.
2.
Replace the EBM. See “Recycling the Used Battery or UPS” on
page 47 for proper disposal.
3.
Plug the new EBM into the UPS as shown in Figure 27.
For additional EBMs, plug the EBM cable into the battery connector
on the adjacent EBM.
EBM
Battery
Connector
UPS Battery
Connector
EBM
Cable
Figure 27. EBM Connections (120V Model Shown)
Testing New Batteries
Press and hold the
button for three seconds to initiate a self‐test.
After the test is finished, the
indicator should turn off. If the
indicator stays on, check the battery connections. Call your service
representative if the problem persists.