UPS Installation Plan and Unpacking
Eaton
®
Power Xpert
®
9395P-900 UPS Installation and Operation Manual P-164000501—Rev 09
www.eaton.com/powerquality
3-23
Table 3-12. 415V Input/Output Ratings and External Wiring Requirements for the Three/Four UPM Models – Separate Battery
Basic Unit Rating
Units
Rating
50/60
Hz
Rating
50/60
Hz
Rating
50/60
Hz
Rating
50/60
Hz
Rating
50/60
Hz
Rating
50/60
Hz
Rating
50/60
Hz
kVA
kW
450
450
500
500
550
550
600
600
675
675
750
750
825
825
Input and Output Voltage
Volts
415/415 415/415 415/415 415/415 415/415 415/415 415/415
AC Input to UPS Rectifier (0.98 Minimum pF)
Full load current plus battery recharge current
(3) Phases, (1) Ground
A
Amps
770
856 942 1027 1156 1284 1412
Minimum Conductor Size
Number per Phase
AWG or
kcmil
(each)
500
(4)
500
(5)
500
(5)
500
(6)
500
(6)
500
(8)
500
(8)
AC Input to UPS Bypass (Five Wire)
Full Load Current
(3) Phases, (1) Neutral, (1) Ground
B
Amps
626 696 765
835 939 1043 1148
Minimum Conductor Size
Number per Phase
AWG or
kcmil
(each)
500
(3)
500
(4)
500
(4)
500
(5)
500
(5)
500
(6)
500
(6)
DC Input from Battery Disconnect to Each
UPS UPM
(1) Positive, (1) Negative
C
Amps
per
UPM
603
603 603
603 603
603 603
Minimum Conductor Size
Number per Pole
AWG or
kcmil
(each)
500
(3)
500
(3)
500
(3)
500
(3)
500
(3)
500
(3)
500
(3)
AC Output to Critical Load (Five Wire)
Full Load Current
(3) Phases, (1) Neutral, (1) Ground
D
Amps
626 696 765
835 939 1043 1148
Minimum Conductor Size
Number per Pole
AWG or
kcmil
(each)
500
(3)
500
(4)
500
(4)
500
(5)
500
(5)
500
(6)
500
(6)
NOTE
V
Callout letters
A
,
B
,
C
, and
D
map to Figure 6-7 on page 6-12.
NOTE
V
If a 4-pole Automatic Transfer Switch (ATS) is used to connect the UPS to a generator or alternative input source, it may interrupt the
UPS input neutral during its transition between sources. For the 9395 UPS:
The ATS transition must be open in both directions. The "break" time for the contacts must be at least 50 ms. This allows the UPS to
operate properly,
however it is important to evaluate whether the critical load will function properly as its neutral reference is rapidly
(50 ms) switched. Note also that if the UPS load is on bypass, an ATS switchover with interruption of the neutral, will interrupt the
return current path and cause a loss of all phase-to-neutral loads.
If an overlapping neutral or make-before-break ATS switch is used, the neutrals must overlap for a minimum of 50 ms during the transition.
Summary of Contents for Power Xpert 9395P-900 Series
Page 2: ......
Page 8: ...This page intentionally left blank...
Page 33: ...Section I Installation...
Page 34: ......
Page 139: ...Section II Operation...
Page 140: ......
Page 231: ......
Page 232: ...P 164000501 6 P 164000501 9...