UPS System Installation
4-8
Power Xpert
TM
9395 550/275 UPS (225–550 kVA) Installation and Operation Manual 164201716—Rev 8
www.eaton.com/powerquality
Figure 4-4. Conduit and Wire Entry Locations
Top Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
TOP VIEW
Interface Entry Conduit Landings for TB1
through TB3 Wiring and X-Slot Connections
(Remove panels to drill or punch conduit holes.)
Ventilation Grill Debris Shield
(Remove shield before operating
system.)
Bottom Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
BOTTOM VIEW
Front
Front
Summary of Contents for Power Xpert 9395 550/275
Page 1: ...Power Xpert 9395 UPS 550 275 UPS 225 550 kVA Installation and Operation Manual...
Page 2: ......
Page 3: ...Power Xpert 9395 UPS 550 275 UPS 225 550 kVA Installation and Operation Manual...
Page 27: ...Section 1 Installation...
Page 28: ......
Page 207: ......
Page 208: ...164201716 8 164201716 8...