2
EATON
IB519013EN
Installation instructions
Installation Instructions - Steeler LED Battery Pack
3. Wire input AC to the fixture, including the unswitched
circuit for the battery pack. Wire according to code.
(Figure 2).
Figure 2.
Figure 4.
Fitting
Test Switch
Ground
Input AC
To unswitched
circuit
QD
4. Connect wires coming out of KO hole and push wires
back in to fixture. (Figure 3).
5. Cover KO with fitting provided. (Figure 4).
Figure 3.
Threaded
Pipe Shown
Connect Battery pack
charging circuit
Figure 5.
Review instructions provided by
the battery pack manufacturer
Battery Pack Installation (If equipped with Motion
Sensor)
1. Mount fixture and remote battery pack (use hardware
appropriate for the structure the battery is installed, not
provided with the fixture) (Figure 5).
2. Suspended fixture a minimum of 12” from the ceiling
and position the battery pack off-center from the
fixture.