Installation instructions for Castell key 

 interlock kit IZM low voltage

 circuit  breakers

EATON 

www.eaton.com

Instructional Leaflet 

IL0131196EN

Effective July 2022

(A)

(B)

(C)

(D)

(E)

(G)

(I)

(J)

(H)

(F)

(P)

(L)

(O)

(M)

(K)

(N)

Figure 1. Contents of kit

Installation of key interlock

Proceed with the following steps:

Step 1: 

Remove the front cover of the breaker by loosening four 

mounting bolts (six bolts if four-pole breaker), and hold the charging 

handle down approximately 45 degrees to simplify removal.

Step 2: 

Remove plug from keylock hole. If hole does not exist, drill a 

1-7/16-inch (36 mm) hole using existing countersink on inside of cover 

as a pilot guide. Use a hole saw such as a Starrett #KAVH0176.

Figure 2. Steps 1 and 2

Step 3: 

If there is an operations counter and operation spring 

installed, remove and save these items for later re-installation. 

Remove existing counter/lock mounting plate and discard it.

Figure 3. Step 3

Bolt

Operations 

counter

Mounting 

plate

Step 4: 

Snap the interlock arm assembly 

(A) 

into place on the shaft 

as shown.

Figure 4. Step 4

Step 5: 

Remove existing screws from the back of the lock  

cylinder 

(B)

, and use one screw to mount the lock cylinder to the 

mounting plate 

(C)

. Note the orientation of the key in this step and 

subsequent steps, and the orientation of the slot in the lock cylinder 

when mounting to the lock mounting plate.

Figure 5. Step 5

Shaft

Breaker swing arm

Interlock arm 

assembly (A)

Metal spring arm  

of interlock arm  

assembly fits behind 

breaker swing arm

Install only finger 

tight—will be 

adjusted later

Castell keylock (B) 

(not supplied)

Castell keylock 

mounting plate (C)

Lock 

cylinder 

slot

Orientation (key 

should be inserted 

into lock cylinder 

slot for Step 5)