background image

15

Instruction Booklet 

IB022003EN

Effective April 2018

Revision #3

Instructions for installation, operation, and

maintenance of Type MVS-ND, metal-enclosed

switchgear assemblies: 4.76 kV or 15.0 kV class

EATON 

 www.eaton.com

DRAFTER

MODEL FILENAME

ENGINEER

MFG. ENG.

NEXT ASSY

TOOL REF.

REFERENCE

SHOP/GENERAL ORDER NO.

ENGINEERING CHANGE NOTICE NO.

UNLESS SPECIFIED TOLERANCES PER

THIS DOCUMENT,  INCLUDING THE  DRAWING AND  INFORMATION 
CONTAINED THEREON,  IS CONFIDENTIAL AND IS THE EXCLUSIVE 
PROPERTY OF  EATON CORPORATION,  AND IS MERELY ON LOAN 
AND SUBJECT TO RECALL BY EATON CORPORATION AT ANY TIME.
BY TAKING POSSESSION OF THIS DOCUMENT, THE RECIPIENT  ACKNOWLEDGES AND AGREES THAT 
THIS DOCUMENT CANNOT BE USED IN ANY MANNER  ADVERSE TO THE INTERESTS OF  EATON, AND 
THAT NO  PORTION OF THIS DOCUMENT MAY BE COPIED  OR OTHERWISE  REPRODUCED  WITHOUT 
THE PRIOR  WRITTEN  CONSENT OF  EATON CORPORATION.  IN THE CASE  OF  CONFLICTING 
CONTRACTUAL PROVISIONS, THIS NOTICE SHALL GOVERN THE STATUS OF THIS DOCUMENT.

EATON CORPORATION - CONFIDENTIAL AND PROPRIETARY

DATE

DATE

DATE

MODEL REV

SCALE

PROJECT NO.

PRODUCT

DWG NO.

PARTS LIST

REV

TITLE BLOCK REV - 4

TITLE

SHEET      OF

THIRD ANGLE

PROJECTION

C

 1 

P. KIM

 

 

 

 

4/10/1991

 

 

 

NTS

 

 

7819C35

3

7819C35

VC-W 5-15 KV SWGR

JOINT TAPING

 

D

IM

EN

SI

O

N

TO

 B

IN

TE

R

P

R

ET

ED

A

S

M

E

 Y

1

4

.5

M

 -

 1

9

9

4

IN

 A

C

C

O

R

D

AN

C

W

IT

H

















































































































































































































































































































































































































































































































































































































































R

E

V

IS

IO

N

  

H

IS

T

O

R

Y

1

 

MATERIALS
   FILLER - A PUTTY-LIKE MATERIAL.TRADE NAMES: DUCTSEALER, DUCT SEAL,  
SCOTCHFIL, EATON. NO. 53351BB AND 53351WX.
 
   TAPE  - HIGH VOLTAGE EPR INSULATING TAPE. TRADE NAME: SCOTCH 130C 
TAPE, EATON. 45151SE.
 
DEFINITIONS
JOINT - AREA TO BE COVERED WITH TAPE. CONSISTS OF BARE CONDUCTOR 
AND 1.5 INCHES OF ANY PRE-INSULATION NEXT TO THE BARE CONDUCTOR.
 
PRE-INSULATION - ANY INSULATING COVERING OR COATING SUCH AS EPOXY 
COATING OR INSULATING TUBING ADJACENT TO AN EXPOSED CONDUCTOR 
PRIOR TO TAPING.
 
PAD - ANY INSULATING TAPE WHICH IS WIDER THAN ONE INCH CONSISTING 
OF ONE LAYER OR MULTIPLE LAYERS WRAPPED DIRECTLY ON TOP OF EACH 
OTHER.
 
LAYER - INSULATING TAPE, 1 INCH WIDE, WRAPPED FROM ONE END OF THE 
JOINT TO THE OTHER, SO EACH SUCCEEDING TURN LAPS THE PREVIOUS 
TURN BY THE AMOUNT SPECIFIED IN THE METHODS PROCEDURE.
 
OVERLAP - A SPECIFIED DISTANCE MEASURED ALONG THE INSULATION 
STARTING FROM THE POINT WHERE THE INSULATION ENDS
 
METHODS
GENERAL
1. ELONGATE INSULATING TAPE 10 TO 25 PERCENT DURING APPLICATION TO 
INSURE A SMOOTH, TIGHT FIT. ON PADS ELONGATE CORNERS ONLY.
2. SHOULD A TAPE ROLL EXPIRE, START THE NEW ROLL BY OVERLAPPING 
THE PREVIOUS END BY .5 TURN.
 
"T"-JOINTS, WITH-HARDWARE
1. CLEAN AREA OF DIRT AND FOREIGN MATTER
2. WIPE PREINSULATION WITH ISOPROPYL ALCOHOL IF NECESSARY
3. APPLY FILLER OVER BARE CONDUCTOR AND HARDWARE TO COVER AND 
SMOOTH OUT THE SURFACE. CONTOUR INTO PRE-INSULATION SURFACES. 
TRY TO PREVENT AIR POCKETS. COVER CONDUCTORS AND HARDWARE WITH 
AT LEAST .12 INCH OF FILLER PER FIG. 1.
4. APPLY 6.00 X .030 THICK PAD #1 OVER JOINT WITH MINIMUM OF 1.0 INCH 
OVERLAP ON PREINSULATION. APPLY 6.00 X .030 THICK PAD #2 OVER PAD #1 
BUT STARTING ON RIGHT SIDE WITH  1.0 INCH OVERLAP ON PREINSULATION 
SEE FIG. 2
5. APPLY  6.00 X .030 THICK PAD #3 OVER PADS #1 AND #2 AND CENTERED ON 
JOINT PER FIG. 3
6. APPLY ONE LAYER OF 1.00 X .030 INSULATING TAPE USING 2/3 LAP AND 
EXTENDING .75 INCH MINIMUM BEYOND THE PADS ON THE PREINSULATION 
(FIG. 4).
 

2

G

M

V

A

-1

7

3

3

T

A

Y

L

O

R

 1

0

/1

9

/0

7

 

U

P

D

A

T

E

D

 D

W

G

C

H

A

N

G

E

D

 F

L

U

ID

Z

N

O

T

E

S

 T

O

 

P

R

E

-I

N

S

U

L

A

T

IO

N

.

3

E

C

O

-0

9

7

2

7

2

S

ID

  

0

3

/2

2

/2

0

1

6

J.

 R

O

B

IN

S

O

N

  

0

3

/2

2

/2

0

1

6

R

E

D

R

A

W

N

 T

O

 

IN

V

E

N

T

O

R

S

H

E

E

T

 2

R

E

M

O

V

E

D

 

J

O

IN

T

S

W

IT

H

 

C

A

B

L

E

/B

O

O

T

 

C

O

N

E

C

T

IO

N

S

 I

N

F

O

.

Figure 9. Thru-joint Field Taping Methods.

Table 8.  Taping chart.

Switchgear Voltage

Pre-insulation or Pad Overlap Minimum

Insulating Tape

kV

in. (mm)

Lap  of Tape

Layers

Number of Pads

Up to 5

1 .50 (38 .1) 

0 .5 

1

1

7 .5 and 15

1 .50 (38 .1) 

0 .66

1

2

Responsibility of installer

• 

For incoming or outgoing terminations, these approved materials 

are not supplied by Eaton and must be obtained and installed by 

others as identified above in the definitions .

• 

For connections involving shipping splits within an assembly, or 

connecting to a transformer, or to an AMPGARD MCC, or to an 

MVA assembly, insulating materials will be supplied by Eaton only 

if necessary . It is the responsibility of the installer to insulate the 

connections in accordance with these instructions .

• 

For an assembly that does not have continuous insulating sleeving 

on the phase bus conductors, the cable connections, or bus 

connections to other apparatus, insulation of these connections 

must be made .

 CAUTION

FAILURE TO INSTALL FIELD INSULATION WHERE NECESSARY IN 

ACCORDANCE WITH THESE INSTRUCTIONS WILL COMPROMISE THE 

ELECTRICAL RATINGS OF THE SWITCHGEAR ASSEMBLY. INSTALL FIELD 

INSULATION TO MAINTAIN THE ELECTRICAL RATINGS.

Summary of Contents for Indoor MVS-ND

Page 1: ...VS ND switchgear bolt tightness for bus connections 13 MVS ND switchgear field taping procedure 5 15 kV 14 Effective April 2018 Revision 3 Instruction Booklet IB022003EN Instructions for installation operation and maintenance of Type MVS ND metal enclosed switchgear assemblies 4 76 kV or 15 0 kV class Indoor MVS ND Switchgear Assembly Outdoor MVS ND Switchgear Assembly ...

Page 2: ...uction Booklet IB022003EN Effective April 2018 Revision 3 Instructions for installation operation and maintenance ofType MVS ND metal enclosed switchgear assemblies 4 76 kV or 15 0 kV class EATON www eaton com ...

Page 3: ...contract The sole source governing the rights and remedies of any purchaser of this equipment is the contract between the purchaser and Eaton NO WARRANTIES EXPRESSED OR IMPLIED INCLUDING WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE OR MERCHANTABILITY OR WARRANTIES ARISING FROM THE COURSE OF DEALING OR USAGE OF TRADE ARE MADE REGARDING THE INFORMATION RECOMMENDATIONS AND DESCRIPTIONS CONTAINED HE...

Page 4: ...hat may arise during installation operation or maintenance of this equipment If further information is desired by the purchaser regarding this particular installation or application information contact the local Eaton sales office see the appropriate section of Eaton s Consulting Application Guide and review the appropriate industry standards Description and application The type MVS ND metal enclo...

Page 5: ...S ND switchgear assembly is securely fastened to a true and level surface according to the floor plan of the customer drawings 6 Always be sure that all hardware is in place and secured by tightening or using safety fasteners before putting an MVS ND switch into operation See Duplex switchgear configuration on Page 13 7 Confirm that all arc chutes and barriers are installed 8 Confirm that no tools...

Page 6: ...eceiving handling storing and installation of the equipment please reference the Instructions for receiving handling storing and installation of medium voltage switchgear in addition to customer drawing package Refer to shipping list for location of the bus hardware and all other joining and installation material Floor requirements The finished foundation surface shall be flat and level within 0 0...

Page 7: ...will face the transformer to the matching holes in the transformer case Minor misalignment may be corrected with a tapered guiding rod of some kind Insert the hardware and tighten Use extreme caution in moving the MVS ND switchgear to prevent damage Outdoor throat connection liquid filled transformers Step 1 Remove the sealing ring flange from MVS ND switchgear throat and set it aside Step 2 The s...

Page 8: ...on For outgoing circuits the terminals are beneath the switch Each terminal pad has a two hole pattern suitable for either a single hole terminal or a terminal with a two hole National Electrical Manufacturers Association NEMA drilling pattern The terminal lugs for the cable if purchased with the switchgear will be bolted to the switchgear terminals If the terminal lugs are not there then they are...

Page 9: ...N SOURCES CONSULT YOUR SAFETY DEPARTMENT BEFORE USING Securing MVS ND switchgear assemblies to foundations If the switchgear assembly was purchased for seismic applications follow the instructions on the specific drawings provided for the switchgear assembly that address the anchoring details Another drawing addresses the load bearing requirements Indoor or outdoor vertical sections are secured us...

Page 10: ...OVED CLEANERS FOR THIS EQUIPMENT m CAUTION ISOPROPYL ALCOHOL IS FLAMMABLE PROVIDE ADEQUATE VENTILATION AND KEEP AWAY FROM FLAMES AND OTHER IGNITION SOURCES CONSULT YOUR SAFETY DEPARTMENT BEFORE USING Step 4 A final thorough inspection should be made to ensure that no tools or other objects are accidentally left inside the enclosure m WARNING DEFEATING OR DISENGAGING SAFETY INTERLOCKS ON AN MVS ND ...

Page 11: ... any dust or dirt that may have accumulated inside each switchgear vertical section paying close attention to insulators and insulating material If the bus is insulated see Electrical parts and insulation check and cleaning for cleaning procedures Insulation and conductor maintenance Insulated bus coverings made from NORYL Insulated bus coverings are made from NORYL a high performance engineering ...

Page 12: ...HGEAR ASSEMBLY FROM ALL POWER SOURCES PRIOR TO INSPECTION MAY RESULT IN SEVERE INJURY OR DEATH THE SWITCHGEAR ASSEMBLY MUST BE COMPLETELY DISCONNECTED FROM ALL POWER SOURCES AND GROUNDED BEFORE PERFORMING ANY INSPECTION m WARNING WHEN ACCESSING FUSES FAILURE TO ASSURE THAT THE FUSES ARE DE ENERGIZED MAY RESULT IN EQUIPMENT DAMAGE BODILY INJURY OR DEATH MAKE SURE THAT ALL POWER SOURCES ARE DE ENERG...

Page 13: ...d Each of the locks is keyed alike and only one key must be available to operating personnel Since the key is retained in its lock when a switch is closed or when a door is opened two things are assured Only one switch may be closed at a time to prevent paralleling of incoming lines Both switches must be locked in the open position to unlock either main door preventing access to energized load sid...

Page 14: ... tape material Trade name Scotch 130C for all cable termination insulation Refer to 3M s taping method instructions Tape Method for Insulating Bus Bar Connections 5 35 kV to Meet ANSI C37 20 Requirements for installation techniques when using this tape Figure 8 DWG NO MODEL REV SHEET OF TITLE ALL REV NOTES LISTED ON SHT 1 REV MODEL FILENAME T BLK REV 4 C 7819C35 2 2 3 JOINT TAPING THRU JOINTS WITH...

Page 15: ... THE INSULATION ENDS METHODS GENERAL 1 ELONGATE INSULATING TAPE 10 TO 25 PERCENT DURING APPLICATION TO INSURE A SMOOTH TIGHT FIT ON PADS ELONGATE CORNERS ONLY 2 SHOULD A TAPE ROLL EXPIRE START THE NEW ROLL BY OVERLAPPING THE PREVIOUS END BY 5 TURN T JOINTS WITH HARDWARE 1 CLEAN AREA OF DIRT AND FOREIGN MATTER 2 WIPE PREINSULATION WITH ISOPROPYL ALCOHOL IF NECESSARY 3 APPLY FILLER OVER BARE CONDUCT...

Page 16: ...lead must be carried through the Zero Sequence current transformer and solid ly ground ed on the load sid e of the ct as shown Use 6 wire with 600V insulation Power Cables Cond uit when used Cable connections to switchgear terminals when used with Insulated Pothead Cond uit must be terminated and solid ly ground ed on the load sid e of the current transformer Zero Sequence transformer Electrical j...

Page 17: ...on Booklet IB022003EN Effective April 2018 Revision 3 Instructions for installation operation and maintenance ofType MVS ND metal enclosed switchgear assemblies 4 76 kV or 15 0 kV class EATON www eaton com Notes N ...

Page 18: ...on Booklet IB022003EN Effective April 2018 Revision 3 Instructions for installation operation and maintenance ofType MVS ND metal enclosed switchgear assemblies 4 76 kV or 15 0 kV class EATON www eaton com Notes N ...

Page 19: ...on Booklet IB022003EN Effective April 2018 Revision 3 Instructions for installation operation and maintenance ofType MVS ND metal enclosed switchgear assemblies 4 76 kV or 15 0 kV class EATON www eaton com Notes N ...

Page 20: ...ved Printed in USA Publication No IB022003EN TBG001292 April 2018 Eaton is a registered trademark All other trademarks are property of their respective owners Instruction Booklet IB022003EN Effective April 2018 Instructions for installation operation and maintenance ofType MVS ND metal enclosed switchgear assemblies 4 76 kV or 15 0 kV class ...

Reviews: