Extension and converting
34
HYDROKRAFT OPERATION MANUAL PVW 250+360
E-PUIO_II001-E April 2021 www.eaton.com
9. Extension and converting
9.1 Extension and converting
Do not make any changes to the Hydrokraft pump.
Warranty is valid for the original delivered
configuration only.
In case of any not authorized modification, warranty will
be denied.
10. Disassembly and replacement
10.1 Tools
Disassembly can be done with conventional standard
tools. No special tools necessary.
10.2 Preparation
IMPORTANT
Hydrokraft pumps must be
De-pressurized
and
disconnected from power supply.
•
Shutdown the complete system according to the
manual of the system.
•
De-pressurize the hydraulic system according to the
manual from the manufacturer.
10.3 Disassembly
To Disassemble the Hydrokraft pump:
•
Make sure the system is pressure-free
•
Make sure the temperature of the Hydrokraft pump is
cold enough to touch safe.
•
Use a collector to collect resigning hydraulic fluid
IMPORTANT
Save the environment
•
Remove all electric cable
•
Remove the hydraulic lines and collect resigning
hydraulic fluid
•
Remove the Hydrokraft pump. Use proper lifting strap
(see ch 4) to empty the complete Hydrokraft pump
•
Close all open ports
•
Prepare the Hydrokraft pump for storage.
11. Decommissioning
The Hydrokraft pump does not require any
special instructions.
If you want to disassemble and replace the Hydrokraft
pump, see chapter 10.
If you want to dispose, see chapter 12.
12. Proper disposal
In terms of health-and environment protection measures,
the different waste types (e.g. hydraulic fluid, metals,
synthetic materials, electronic devices, cables, etc.) has to
be disposed separately.
The national valid laws and regulations for the use of
lubricants and the proper disposal must be taken into
consideration. The competent authority will provide
assistance.