Summary of Contents for EZ II Series

Page 1: ...15 kV and 25 kV class EZ II splice installation instructions For A B and C cable ranges only COOPER POWER SERIES Splices MN650007EN Effective January 2016 Supersedes April 2015...

Page 2: ...FOR A PARTICULAR PURPOSE OR MERCHANTABILITY OTHER THAN THOSE SPECIFICALLY SET OUT IN ANY EXISTING CONTRACT BETWEEN THE PARTIES ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON THE CONTENTS OF T...

Page 3: ...Contents SAFETY INFORMATION Safety Information iv PRODUCT INFORMATION Introduction 1 Acceptance and Initial Inspection 1 Handling and Storage 1 Standards 1 Description 1 PREPARATION OF CABLES TO BE S...

Page 4: ...king around high voltage lines and equipment and support our Safety For Life mission Safety information DANGER Hazardous voltage Contact with hazardous voltage will cause death or severe personal inju...

Page 5: ...on receipt inspect the shipping container for signs of damage Unpack the splice and inspect it thoroughly for damage incurred during shipment If damage is discovered file a claim with the carrier imme...

Page 6: ...1 1 8 29 mm of the cable insulation exposing the bare conductor Remove sharp edge of insulation by beveling at 45 angle for approximately 1 8 3 mm See Figure 3 Clean the cable insulation with an appr...

Page 7: ...rds the end of the connector Rotate each crimp 90 Install as many crimps as possible without overlapping crimps Note N After crimping remove any sharp edges or raised points on the compression connect...

Page 8: ...rejacketing sleeve per the manufacturer s recommended instructions Figure 6 Cutaway of installed splice CONCENTRIC NEUTRAL CONNECTED TOGETHER SINGLE CONCENTRIC NEUTRAL BOTH ENDS CENTER SPLICE BETWEEN...

Page 9: ...This page is intentionally left blank 5 15 KV AND 25 KV CLASS EZ II SPLICE INSTALLATION INSTRUCTIONS MN650007EN January 2016...

Page 10: ...This page is intentionally left blank 6 15 KV AND 25 KV CLASS EZ II SPLICE INSTALLATION INSTRUCTIONS MN650007EN January 2016...

Page 11: ...This page is intentionally left blank 7 15 KV AND 25 KV CLASS EZ II SPLICE INSTALLATION INSTRUCTIONS MN650007EN January 2016...

Page 12: ...on 2300 Badger Drive Waukesha WI 53188 United States Eaton com cooperpowerseries 2016 Eaton All Rights Reserved Printed in USA Publication No MN650007EN Rev 01 Supersedes 5000050839 Rev 03 SAFETY FOR...