
I.L. 29C211E
Effective
04/04
Page 6
operation.
electrical operator and address electrical and manual
The following procedures describe the operation of the
3-0 OPERATION
mounted on a grounded metal surface.
connection may be omitted where the circuit breaker is
1-4 to ground the electrical operator frame. The ground
connect a ground conductor (green) as shown in Figure
When the assembly is mounted on an insulated surface,
See Figure 1-4.
2-10.Connect control wires to remote control devices.
(TB1). See Figure 1-4.
2-9.Connect the control wires to the terminal block
firmly but do not exceed 28 pound-inches (3 N.m.).
started correctly to avoid cross threading, tighten
2-8.After assuring that all four mounting screws are
Figure 2-2B Electrical Operator Mounting hardware (see Table 2.1) J-Frame