VISOR INSTALLATION INSTRUCTIONS
1. Remove power from floodlight.
2. Place floodlight face up.
3. Carefully align visor with two (2) screw holes at the top of the fixture
shown in the image above.
4. Install screws provided with visor, taking care to not scratch the finish of
the floodlight. Torque to 80 in-lbs (9.0 N-m).
5. Install floodlight per above instructions.
NOTE:
Visor can be installed before or after floodlight has been in operation.
GUARD INSTALLATION INSTRUCTIONS
1. Remove power from floodlight.
2. Place floodlight face up.
3. Carefully align guard with four (4) screw holes on each side of the
fixture shown in the image above.
4. Install screws provided with guard taking care to not scratch the finish
of the floodlight. Torque to 80 in-lbs (9.0 N-m).
5. Install floodlight per above instructions.
NOTE:
Guard can be installed before or after floodlight has been in
operation.
NOTE:
Visor and guard can both be used on a floodlight at the same time.
Visor and guard are always installed in the field and are not factory installed.
All statements, technical information and recommendations contained herein are based on information and tests we believe to be reliable. The accuracy or completeness thereof are not
guaranteed. In accordance with Eaton’s Crouse-Hinds Division’s “Terms and Conditions of Sale,” and since conditions of use are outside our control, the purchaser should determine
the suitability of the product for his intended use and assumes all risk and liability whatsoever in connection therewith.
Eaton’s Crouse-Hinds Division
IF 1684
1201 Wolf Street Syracuse, NY 13208 • U.S.A.
Revision 2
Copyright© 2022
Revised 04/22
Supersedes 12/13