4.2 DISCONNECT AND LOCKOUT/TAGOUT

The disconnect handle is furnished with three (3) holes for lockout/tagout purposes.
1.  Turn handle to the ‘OFF’ position.

2.  Depress lockout tab at the end of the handle.

3.  Install OSHA approved lock or tag.

4.  Release lockout tab.

WARNING

To avoid ignition of explosive atmospheres, all circuits must be de-energized 

before opening cover.

CAUTION

To avoid damage to the integral disconnect operating mechanism, be sure the 

disconnect coupling is in the off position before closing cover.

Disconnect

shaft

Disconnect

coupling 

‘OFF’ position

3.6 COMMUNICATION MODULES

Available options:

Protocol   

               Suffix

Profibus .......................................

CP

Devicenet ....................................

CD

CAN Open ...................................

CC

Modbus .......................................

CM

Ethernet .......................................

CE

4. GENERAL OPERATION

4.1 KEYPAD INTERFACE

*To review selection criteria, observe the control pad screen through the viewing window.  

Criteria is identified in the lower corners of the control pad corresponding to the buttons (as 

shown).  Refer to the drive manufacturer’s manual for additional instruction on the proper use and 

capability of the keypad interface.

All communication modules will be installed in ‘Slot 3’ on the VFD.  Plug in and 

fasten using the integral screw provided.

IF 1619 • 05/18                                                                                            Copyright

©

 2018, Eaton’s Crouse-Hinds Division                                                                                                      Page 8

Left 
soft 
key

Up, down, 

left and right 

arrow keys

Right 
soft 
key

Drive 
start

Drive 
stop

Lockout tab

Summary of Contents for CROUSE-HINDS ACE10 1

Page 1: ...intenance torque verification pushbutton lubrication window cleaning Page 9 5 4 Status indication filter maintenance Page 9 5 5 Explosive event required maintenance Page 9 6 Technical data 6 1 Technic...

Page 2: ...IT 3 Section 8 3 for replacement instructions 1 4 HOT SURFACES 1 5 ENCLOSURE SAFETY WARNING To avoid personnel injury and property damage clean dirt and debris from flat ground joint surfaces before t...

Page 3: ...jury and property damage DO NOT remove or modify the control pad viewing window It is imperative that the enclosure be well ventilated to ensure reliable performance Adequate space around the intake a...

Page 4: ...injury utilize the dedicated lifting eye and handle appropriately to ensure safe installation 3 Use the dedicated lifting eye to mount enclosure on suitable mounting surface Select a mounting location...

Page 5: ...2 4 DIMENSIONAL DRAWINGS IF 1619 05 18 Copyright 2018 Eaton s Crouse Hinds Division Page 5...

Page 6: ...PRE FILTER INSTALLATION 3 2 LINE FEED 2 5 MOUNTING 1 Select a mounting location that will provide suitable strength rigidity and space per Section 2 1 for supporting the ACE system and all contained w...

Page 7: ...ital inputs Constant speed 1 select 1 on Acceleration deceleration select Reset Forward 0 Reverse 1 Stop 0 Start 1 Digital input outputs Output Running Output Ready Ground selection Auxiliary voltage...

Page 8: ...n 3 6 COMMUNICATION MODULES Available options Protocol Suffix Profibus CP Devicenet CD CAN Open CC Modbus CM Ethernet CE 4 GENERAL OPERATION 4 1 KEYPAD INTERFACE To review selection criteria observe t...

Page 9: ...OP or ALARM condition Solid red power on drive stopped fault Solid green drive running Blinking red drive running in alarm mode maintenance required Lights off power off 5 5 EXPLOSIVE EVENT REQUIRED M...

Page 10: ...12 0 14 0 7 5 606 T4A Figure 1 ACE10 10 16 0 18 0 10 674 T4A Figure 1 ACE10 15 60 J 2 20 0 25 0 15 737 T4A Figure 1 ACE10 20 26 0 30 0 20 847 T4A Figure 1 ACE10 25 30 0 35 0 25 875 T4A Figure 1 ACE10...

Page 11: ...screws holding the baffle to the blower bracket Remove baffle and hold for re assembly 8 Attach baffle to new blower bracket using the same three 3 screws 9 Align new manifold to enclosure wall 10 Al...

Page 12: ...ntended use and assumes all risk and liability whatsoever in connection therewith Eaton s Crouse Hinds Division IF 1619 1201 Wolf Street Syracuse New York 13208 U S A Revision 4 Copyright 2018 Revised...

Reviews: