Eaton's voltage regulator application

The CRA can be placed on Eaton and McGraw-Edison 

voltage regulators by following the procedure given in 

this section. The CRA is primarily designed as a control 

replacement on voltage regulators not manufactured by 

Eaton. Control replacement for Eaton and McGraw-Edison 

voltage regulators with a quick-disconnect control cable 

can be simplified by using a standard replacement control. 

Pricing and availability for standard replacement control 

assemblies can be obtained by contacting your Eaton 

representative.
The replacement procedure may be performed in the shop 

or the field. The regulator must be bypassed or removed 

from service prior to installing the CRA. Always bypass the 

regulator when installing the CRA in the field to prevent 

opening the CT circuit while the regulator is under load.
1.  Bypass the regulator and remove it from service.
2.  Open the existing control box and swing out the control 

panel.

3.  Remove the existing control panel.
4.  There are two control cable scenarios:

A.  If replacing a control with a quick-disconnect 

control cable, it may be possible to use the 

quick-disconnect pigtail and connector. Do so by 

following these steps:
1.  Disconnect the control cable quick-disconnect 

connector from the inside of the control box.  

2.  If the incoming control cable leads are not 

marked or color coded, place appropriate wire 

markers on the control cable leads to mark it 

for later reference. 

3.  Disconnect the incoming pigtail leads form the 

terminal block and knife switches on the back 

panel and remove the pigtail from the box.

4.  Remove the nut on the inside of the control 

box that attaches the control cable to the 

control box.  Retain the nut, washer from the 

inside of the control box and the rubber gasket 

from the outside of the control box.

B.  If replacing a control with a hardwired control cable:

1.  If the incoming control cable leads are not 

marked or color coded, place appropriate wire 

markers on the control cable leads to mark it 

for later reference.

2.  Disconnect the incoming control cable leads 

from the terminal blocks and knife switches on 

the back panel.

3.  Remove the control cable from the existing 

control box.

5.  Remove the nameplate from the old control box 

assembly and retain it with the hardware.

6.  With the adjustable wrench or appropriate socket 

wrench, remove and retain the bolts holding the old 

control box on the regulator and remove the old control 

box assembly from the regulator.

7.  Remove the supplied universal control box mounting 

bracket (see Figure 3) from the CRA control box.

8.  In the majority of installations, the universal bracket 

will not be required. In the event the CRA control box 

does not mount directly to the Eaton/McGraw-Edison 

regulator, the universal bracket may be altered to 

accommodate hole and/or drill patterns.

9.  Place the CRA control box on the regulator and secure 

it with the appropriate hardware.

10.  Reattach the nameplate to the front of the CRA control 

box. The nameplate bracket may be removed and the 

Eaton/McGraw-Edison nameplate affixed directly to the 

CRA control box.

11.  Ground the control cabinet via the ground boss located 

on the side of the cabinet.

12.  Control cable installation:

A.  Quick-disconnect control cable:

1.  Remove the cable grip from the top of 

the CRA control box and install the quick 

disconnect connector from the control cable 

into the hole. Be sure to properly seat the 

gasket between the top of the control box and 

connector.

2.  Tighten the control cable connector from the 

inside of the control box using the nut and 

washer retained earlier.

WARNING 

Hazardous Voltage. The control box must be solidly 

earth grounded. Failure to comply can result in severe 

personal injury and equipment damage. 

                   

VR-T216.0

DANGER

Explosion Hazard. Voltage regulators are subject to 

high circulating current during bypass switching. 

Refer to 

Service Information MN225003EN CL-7 

Voltage Regulator Control Installation, Operation, and 

Maintenance Instructions

 for information on the CRA 

Control, and refer to the instruction manual supplied by 

the voltage regulator manufacturer for specific safety 

procedures for bypass switching. Failure to comply will 

result in severe personal injury or death.

                     

VR-T214.0

DANGER 

Flashover Hazard. Opening the CT circuit under load 

will produce high voltages in the control box. Always 

bypass the regulator when installing the CRA to prevent 

opening the CT circuit while the regulator is under load. 

Failure to comply can result in severe personal injury or 

death.

                                                                                         

VR-T215.0

15

CL-7 control replacement assembly installation instructions and service information

   MN225017EN   October 2016

Summary of Contents for COOPER POWER SERIES

Page 1: ...voltage regulator control replacement assembly CRA installation instructions and service information COOPER POWER SERIES Voltage Regulators MN225017EN Effective October 2016 Supersedes January 2014 S225 70 4 ...

Page 2: ...ONTRACT BETWEEN THE PARTIES ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON THE CONTENTS OF THIS DOCUMENT SHALL NOT BECOME PART OF OR MODIFY ANY CONTRACT BETWEEN THE PARTIES In no event will Eaton be responsible to the purchaser or user in contract in tort including negligence strict liability or other wise for any special indirect incidental or consequential damage or loss whatsoever incl...

Page 3: ...AGE REGULATOR APPLICATION Replacement Procedure 8 HOWARD INDUSTRIES VOLTAGE REGULATOR APPLICATION Replacement Procedure 12 EATON S VOLTAGE REGULATOR APPLICATION Replacement Procedure 15 CONTROL SETUP Ratio Correction 19 Ratio Correction and Control Programming 19 CONTROL PROGRAMMING Powering the Control Using Line Power 20 Powering the Control Using External Power 21 OPERATIONS CHECK Field Operati...

Page 4: ...tion DANGER Hazardous voltage Contact with hazardous voltage will cause death or severe personal injury Follow all locally approved safety procedures when working around high and low voltage lines and equipment G103 3 WARNING Before installing operating maintaining or testing this equipment carefully read and understand the contents of this manual Improper operation handling or maintenance can res...

Page 5: ...rage Be careful during handling and storage of the control to minimize the possibility of damage If the control is to be stored for any length of time prior to installation provide a clean dry storage area Standards Eaton s voltage regulator controls are designed and tested in accordance with the following standards IEEE Std C37 90 1 2012 standard IEEE Std C37 90 2 2004 standard IEEE Std C57 13 20...

Page 6: ...ssary Installation Making connections to the CRA The CRA connections are made to terminal board TB1 located on the top of the back panel see Figure 2 A color coded wiring decal clearly identifies connections see Figure 1 Connecting the leads to the terminal board requires using the tool supplied with the CRA assembly or an acceptable substitute see Figure 4 To use the tool place it in the square h...

Page 7: ...R G G VS VS VM C1 C3 HS R3 L3 NL DHR OC TB1 Ratio Correction Transformer RCT TB8 C Knife Switch V1 Knife Switch V6 Knife Switch TB2 RCT Terminal Board 3 CL 7 control replacement assembly installation instructions and service information MN225017EN October 2016 ...

Page 8: ...l Cable Entrance Ground Point Universal Control Box Mounting Bracket Figure 3 CRA external side view Figure 4 Tool supplied for connecting leads 4 CL 7 control replacement assembly installation instructions and service information MN225017EN October 2016 ...

Page 9: ...n Step 7 13 Ground the control cabinet via the ground boss located on the side of the cabinet 14 Examine the control cable Allow approximately 12 of lead length to protrude past the end of the conduit nut This will facilitate connection to the top terminal strip and knife switches located in the CRA control box 15 Remove the cable grip nut and rubber cable grommet from the cable entrance of the ne...

Page 10: ... and switches The Siemens connections are labeled in Red and Eaton s identification is labeled in Black 22 If the motor capacitor had been located in the old control box install and reconnect it in the CRA control box and secure the capacitor 23 Verify that A The V1 and V6 knife blade switches are open B The C knife blade is closed shorted 24 If not already installed install the control panel on t...

Page 11: ... 10 18 White E Violet U12 Blue P2 Green U2 Orange C2 Yellow E1 White E Wire Color Code 1 White 2 White 3 Orange 4 Blue 5 Blue 6 White Green 7 White Green 8 White Red 9 White Orange 10 Black 11 Black 12 White 13 Violet 14 Green 15 Red 16 Red 17 Black 18 White 19 White 20 White Blue 21 White Blue 23 White Brown 24 White 25 Black 26 White Brown 27 Brown 28 Brown 29 Red Black 30 Blue 31 Green 32 Yello...

Page 12: ...k washers and nuts provided 12 Attach the nameplate to the front of the CRA control box with retained hardware 13 Ground the control box using the ground boss located on the side 14 Examine the control cable Allow approximately 12 of lead length to protrude past the end of the conduit nut This will facilitate connection to the top terminal strip and knife switches located in the CRA control box 15...

Page 13: ...d in the bottom of the CRA control box Using the tool supplied with the CRA connect the black wire to the top of the V1 switch Per the GE nameplate and the system voltage desired connect the other end of the black wire to the bottom of TB1 20 or 21 or 22 23 If the motor capacitor had been located in the old control box install and reconnect it in the CRA control box and secure the capacitor 24 Ver...

Page 14: ... Green 28 Red White 29 Blue White 31 Black 32 16 AWG Bottom of 20 or 21 or 22 Black 20 AWG White 20 AWG Red Black 30 Green Black 26 Blue Black 10 Orange Black 20 Orage 21 Blue 22 Eaton s connections shown in parentheses 10 CL 7 control replacement assembly installation instructions and service information MN225017EN October 2016 ...

Page 15: ...Code 1 White 2 White 3 Orange 4 Blue 5 Blue 6 White Green 7 White Green 8 White Red 9 White Orange 10 Black 11 Black 12 White 13 Violet 14 Green 15 Red 16 Red 17 Black 18 White 19 White 20 White Blue 21 White Blue 23 White Brown 24 White 25 Black 26 White Brown 27 Brown 28 Brown 29 Red Black 30 Blue 31 Green 32 Yellow 33 Orange 34 Red 35 Brown 36 Black 37 White Note N If the color codes does not m...

Page 16: ... existing control cable Select one of the two supplied cable grommets that best fits the existing cable place grommet onto the control cable 16 If the motor capacitor was located in the old control box do not cut the terminals from the capacitor wires Cut all other terminals from the end of the cable conductors 17 Strip the insulation back approximately 5 16 of an inch on each lead to be connected...

Page 17: ... Howard Connections G G R R L L OC OC DHR DHR NL NS V6 MS V1 PS C Switch Top C C Switch Bottom CO G R R L L OC DHR NL NL NL2 HS HS 2 G G 1 V2 V5 V1 V4 C2 C3 20 21 23 G V6 V1 C G R L DHR NS OC MS PS C CO G If the MS lead is used as a motor power source it will not be used The motor power and sensing voltage sources will both be supplied to the control through the PS lead Figure 10 TB1 Howard connec...

Page 18: ...IRE COLOR CODE 1 White 2 White 3 Orange 4 Blue 5 Blue 6 White Green 7 White Green 8 White Red 9 White Orange 10 Black 11 Black 12 White 13 Violet 14 Green 15 Red 16 Red 17 Black 18 White 19 White 20 White Blue 21 White Blue 23 White Brown 24 White 25 Black 26 White Brown 27 Brown 28 Brown 29 Red Black 30 Blue 31 Green 32 Yellow 33 Orange 34 Red 35 Brown 36 Black 37 White L N 2 10 18 White G Purple...

Page 19: ...e old control box assembly and retain it with the hardware 6 With the adjustable wrench or appropriate socket wrench remove and retain the bolts holding the old control box on the regulator and remove the old control box assembly from the regulator 7 Remove the supplied universal control box mounting bracket see Figure 3 from the CRA control box 8 In the majority of installations the universal bra...

Page 20: ...o further action is required B If the regulator has a source side PT input present and it will be used to supply a source side voltage for reverse operation take the following steps i Connect the white black lead to the top of the V6 switch ii Using the supplied tool remove the white brown number 23 lead from the bottom section of V1 and place it at the bottom of V6 iii FC 44 enter function code 4...

Page 21: ...Source PT Black Load PT Green CT Positive Red CT Negative Table 4 CRA Kit Connections for Eaton McGraw Edison Voltage Regulators Connection Point Wire Color V1 Black G White C bottom Red C top Green HS Orange R1 Blue V6 White Black NL Red Black L1 Green Black DHR Orange Black Motor Cap 1 Lt Blue Black Motor Cap 2 Black White 17 CL 7 control replacement assembly installation instructions and servic...

Page 22: ...IRE COLOR CODE 1 White 2 White 3 Orange 4 Blue 5 Blue 6 White Green 7 White Green 8 White Red 9 White Orange 10 Black 11 Black 12 White 13 Violet 14 Green 15 Red 16 Red 17 Black 18 White 19 White 20 White Blue 21 White Blue 23 White Brown 24 White 25 Black 26 White Brown 27 Brown 28 Brown 29 Red Black 30 Blue 31 Green 32 Yellow 33 Orange 34 Red 35 Brown 36 Black 37 White L N 2 10 18 White Red Blac...

Page 23: ...by dividing the nominal system voltage by the control source voltage and entering this value at FC 44 enter function code 44 and then press the down arrow On Eaton McGraw Edison regulators the internal PT ratio can be read from the voltage chart Example If the regulator nameplate lists a control source voltage of 120 volts for a system voltage of 7620 the Internal PT Ratio will be 7620 120 63 5 2 ...

Page 24: ...volts and will be 123 5 3 0 120 5 If the system voltage is 7620 the Overall PT Ratio will be 7620 120 5 63 2 Control programming Once the control is installed power the control for programming Powering the control using line power The control can be powered for programming by connecting the regulator to the power distribution lines It is important to perform the following steps before beginning th...

Page 25: ... V1 switch on the back panel 2 Putting the regulator into service Using any type of bypass switch single pull or individual switches power can be applied by closing the disconnect switches opening the bypass switch and putting the regulator fully into service Make sure that the regulator is in the neutral position before starting the process and verify this by using three independent methods Use l...

Page 26: ...he operations test 1 Make sure that the V1 switch on the back panel is open 2 Connect 120 Vac to the EXTERNAL SOURCE terminals located on the control front panel Be certain the voltage polarity is correct when applying power to the control positive to the black terminal neutral to the white terminal and ground to green With 120 volts applied to the external source terminals perform the following 1...

Page 27: ...witching Refer to Service Information MN225003EN Voltage Regulator CL 7 Series Control Installation Operation and Maintenance Instructions for information on the CRA Control and refer to the instruction manual supplied by the voltage regulator manufacturer for specific safety procedures for bypass switching Failure to comply will result in severe personal injury or death VR T214 0 23 CL 7 control ...

Page 28: ...d States Eaton com Eaton s Power Systems Division 2300 Badger Drive Waukesha WI 53188 Eaton com cooperpowerseries 2016 Eaton All Rights Reserved Printed in USA Publication No MN225017EN October 2016 Supersedes S225704 January 2014 For Eaton s Cooper Power series CL 7 control product information call 1 877 277 4636 or visit www eaton com cooperpowerseries ...

Reviews: