4.  Disconnect the 18-pin male connector end of the tester 

interrupter interface cable (Item 1) from the 18-pin 
female end of the VFI control wire harness (Item 3).

NOTICE

Equipment misoperation. The capacitors upon the Tri-
Phase and TPG boards will retain a charge of 20 Vdc 
upon completion of control testing. Apply a 5 k ohm 
resister between ground and the P1-7, P1-5, and P1-3 
board terminals for 10 seconds prior to returning the 
control to service. Failure to comply can result in false 
tripping activity by the control upon reinstallation. 

T318.0

5.  Reconnect the VFI control wire harness (Item 3) to the 

18-pin male receptacle located upon the Tri-Phase/TPG 
control.

6.  Disconnect the interrupter and control interface cables 

(Items 1 and 2) from the VFI tester and store the 
cables in the storage compartment located in the cover 
of the VFI tester.

7. Close 

the 

VFI 

switches.

Control tests

The VFI tester enables testing and verification of minimum 
trip timing values for each phase of the VFI unit. Testing at 
nominal test current values of 150, 300 and 1000 percent 
of minimum trip current levels verifies Tri-Phase/TPG board 
response at current levels typically requiring slow, medium 
and fast trip operations.

Test current values are set by selectively closing a group of 
toggle switches controlling a stepped network of resistors 
within the VFI tester unit (Figure 5). Placing the 4-30 A 
toggle switch into the ON position enables operation of a 
4-30 A fine adjustment rheostat for precise adjustment of 
test current levels.

Pressing the Control Test button of the VFI tester initiates 
injection of simulated fault current into the Tri-Phase/TPG 
control board and concurrently begins measurement of the 
accrued time between test initialization and and issuance 
of a trip signal. Upon issuance of a trip signal, the flux-shift 
tripper of the respective phase being tested should operate 
as the LCD display indicates the accrued trip-time interval. 

ote: 

N

Once a control test is initiated, pressing and releas-
ing the control test button a second time will result 
in the test being aborted. 

Battery tests can not be conducted during a control test.

Initial tester setup 

Refer to Figure 2 for identification of individual VFI tester 
switches and other features referenced within the following 
setup procedures. 

1. 

Connect the VFI tester to the VFI Padmount unit 
following the procedures described in the 

Testing 

In-Service VFI  Units

 section of this service bulletin.

2.  Connect external multi-meter to the multi-meter tester 

connection jacks and set external meter to appropriate 
current measurement range. 

3.  Energize the tester by setting the power switch to ON.

Conduct internal flux-shift tripper test

The internal VFI tester flux-shift trippers should be tested 
for correct operation at the beginning of every control 
testing session. Failure to verify the correct operation of the 
internal flux-shift trippers prior to a control test could result 
in an erroneous assessment of control performance, in the 
event of a malfunction of the internal VFI tester flux-shift 
trippers.

Verify the internal flux-shift trippers are operational with the 
following procedure:

1. 

Depress all three internal flux-shift trippers. Refer to 
Figure 3 for steps 1 through 8.

2.  Place the Test Selector Switch into the INTERNAL 

TRIPPERS position.

3.  Place the Phase Selector Switch into the A-PHASE 

position.

4.  Press and release the Tripper Test button. The A-Phase 

flux-shift tripper on the VFI tester should operate 
immediately.

5.  Place the Phase Selector Switch into the B-PHASE 

position.

6.  Press and release the Tripper Test button to initiate the 

test. The B-Phase flux-shift tripper on the VFI tester 
should operate immediately.

7. 

Place the Phase Selector Switch into the C-PHASE 
position.

TEST

CONTROL

4-30A

30A

60A

120A

240A

1X

4-30A

2X

ON

ON

ON

ON

ON

1X/2X Current

Multiplier Switch

Current

Adder

Switches

4-30A Rheostat

Enable Switch

4-30A Rheostat

Figure 5.  VFI tester current adjustment switches.

Operating Instructions

   MN285001EN   December 2018

7

Summary of Contents for COOPER POWER SERIES

Page 1: ...VFI tester operating instructions COOPER POWER SERIES Underground Distribution Switchgear MN285001EN Effective December 2018 Supersedes MN285001EN January 2015...

Page 2: ...URPOSE OR MERCHANTABILITY OTHER THAN THOSE SPECIFICALLY SET OUT IN ANY EXISTING CONTRACT BETWEEN THE PARTIES ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON THE CONTENTS OF THIS DOCUMENT SHALL...

Page 3: ...1 DESCRIPTION OF TESTER VFI Tester Front Panel 2 Description and Functionality of VFI Tester Front Panel 3 SPECIFICATIONS Instrumentation 4 Protective Circuits 4 OPERATING PROCEDURES Testing In Servi...

Page 4: ...ry CAUTION Indicates a potentially hazardous situation which if not avoided may result in minor or moderate injury NOTICE Indicates a potentially hazardous situation which if not avoided may result in...

Page 5: ...on device designed to simulate Fault Current for verification of minimum trip values and time current characteristics of Tri Phase and TPG electronic control boards utilized in VFI pad mounted switchg...

Page 6: ...CT METER JACKS CURRENT TRIPPER TEST BATTERY TEST 4 30A 30A 60A 120A 240A 1X 4 30A 2X CONVENIENCE OUTLET 120 VAC C PHASE TRIPPER B PHASE TRIPPER A PHASE TRIPPER TEST TRIPPERS TRIPPERS G F E T J H K V P...

Page 7: ...ase TPG Control Test Cable 15 Phase Select Switch Selection of phase to be tested 16 Testing Mode Selector Switch Selection of either external test of flux shift trippers within VFI unit under test in...

Page 8: ...Dimensions Approximate 318 mm 12 5 High 432 mm 17 Wide 432 mm 17 Deep Weight 15 87 kg 35 lbs cables excluded Temperature range Operating Range 0 to 50 C Storage Range 20 C to 65 C CAUTION Equipment m...

Page 9: ...Do not operate it using a floating power source such as a portable generator 3 Connect the 14 pin female 14 pin male interrupter interface cable Item 1 to the VFI tester at the interrupter port Refer...

Page 10: ...quipment damage Use care while disconnecting and reconnecting cables to the Tri Phase TPG control Do not misalign male and female connectors or allow the full weight of the tester cable to be transfer...

Page 11: ...the accrued trip time interval ote N Once a control test is initiated pressing and releas ing the control test button a second time will result in the test being aborted Battery tests can not be cond...

Page 12: ...A Phase flux shift tripper on the VFI tester operates when the fault current exceeds 50 A 5 Place the Phase Select switch into the B PHASE position 6 Repeat steps 2 through 4 7 Place the Phase Select...

Page 13: ...mum trip phase 1 Place the 4 30 A and 120 A Fault Current switches on the VFI tester into the ON position All other Fault Current switches should be in the OFF position 2 Place the Phase Select Switch...

Page 14: ...he minimum trip level for Ground on the control board to 50 A Test procedure 150 of minimum trip ground TPG only 1 Place the Phase Select Switch on the VFI tester into the A PHASE position 2 Press and...

Page 15: ...ion 7 Repeat steps 2 through 5 8 Place the Phase Select switch into the C PHASE position 9 Repeat steps 2 through 5 NOTICE Equipment misoperation The capacitors upon the Tri Phase and TPG boards will...

Page 16: ...t button waiting 5 seconds and then pressing the Control Test button again The C Phase Fault Target should now be black 16 Place the Ground Trip Block switch into the OFF position TPG only 17 Set the...

Page 17: ...um trip setting of 50 A Control setup 5X minimum trip multiplier test 250 A 1 Set the emergency trip multiplier switches for A Phase B Phase and C Phase for 5X 8X 3 2X 1X default Test procedure 5X min...

Page 18: ...lt Current switch into the ON position 15 Press and release the Control Test button to initiate flow of simulated fault current to the control 16 Verify that the B Phase flux shift tripper on the VFI...

Page 19: ...ous Trip switches into the ON position 4 Place the Ground Trip Block During Inrush switch into the OFF position 5 Place the Inrush Restraint switch into the ON position 6 Set the A Phase B Phase and C...

Page 20: ...ux shift tripper 16 Press and release the Control Test button to initiate flow of simulated fault current to the control 17 After all three of the flux shift trippers operate verify continuity between...

Page 21: ...Always use a hotstick when working with this equipment Failure to do so could result in contact with high voltage which will cause death or severe personal injury G108A 0 IMPORTANT If service conditio...

Page 22: ...erface cable Item 1 from the 14 pin female end of the pad mounted cable Item 2 originating from the front plate of the VFI unit under test 17 Reconnect the VFI control cable Item 2 to the receptacle l...

Page 23: ...nto the A PHASE position If it does not proceed to step 11 9 Energize the tester by setting the power switch to ON 10 Press the Tripper Test button The A Phase flux shift tripper in the padmount unit...

Page 24: ...battery test may be placed back into service 5 If the battery fails the test the LCD display of the tester will display the Replace Battery message Replace the exhausted battery with a new equivalent...

Page 25: ...2 A Phase Trip XXX xxx Seconds Indicates elapsed time between initialization of the A Phase control test and execution of a trip command by the VFI control board 13 B Phase Trip XXX xxx Seconds Indica...

Page 26: ...Figure 8 Tri Phase board Phase Minimum Trip Dip Switches Instantaneous Trip Dip Switches Independent or 3 phase Trip Selector Switch Appendix B Operating Instructions MN285001EN December 2018 22...

Page 27: ...m Trip Ground Trip Block Switch Phase Instantaneous Trip Dip Switch Ground Instantaneous Trip Dip Switch Independent or 3 phase Trip Selector Switch Ground Minimum Trip Dip Switch Operating Instructio...

Page 28: ...Cleveland OH 44122 United States Eaton com Eaton s Power Systems Division 2300 Badger Drive Waukesha WI 53188 United States Eaton com cooperpowerseries 2018 Eaton All Rights Reserved Printed in USA Pu...

Reviews: