background image

15

7   Common operation of the web screens

Installation and Operating Instructions  Web-Controller

   40071860236 (E)   February 2019   www.eaton.com

7.3   Overview of all faulty luminaires (complete overview)

Example shows one lumi-

naire failure with following 

information:

O

O

 Luminiare in Line 1

O

O

 Luminaire in Zone 1

O

O

 Luminaire address 1 

(Lum1 in Zone)

O

O

Category: Exit sign

O

O

Type: EB LED CGLine

O

O

Information text (max. 

20 chara.)

O

O

Batteryfailure

O

O

Luminaire in „main-

tained light“

O

O

Luminaire was added 

in the Web-Controller at 

this date

O

O

Next FT or DT is on 

01/01/2015 at 6:00 p.m.

O

O

With click on the magni-

fying glass, it is possible 

to enter to the building 

layout picture, if it is 

prepared

The menu “Oveview” 

1

 and the tab “Overview luminaire failure” 

2

 display all lumi-

naires with a fault 

3

:

O

O

L = line no. 1-4

O

O

Z = zone 2-16

O

O

B = luminaire address 1-400

O

O

ID = 6-digit hex address for the luminaire, e.g. FE18AC

O

O

Category = category of the luminaire type (SL= Safety luminaire, RZ= Exit sign

O

O

Type =  luminaire type, e.g. Guideled SL

O

O

Information = additional text for information which is entered in the CGVision or 

PC software

4

: • Absent = communication fault  

      to the luminaire  

    • Safety Bulb = lamp error 

    • Battery = battery or charge error 

    •  White clock = FT failure 

    • Blue clock = DT failure 

    • i = luminaire operation mode

1

2

3

5

:  •  Discover Date = date when the luminaire 

was detected by the Web-Controller

    •  Next test = next automatic FT or DT

    •  Luminaire position = target designation 

of luminaire

4

5

Summary of Contents for CGLine+ Web Controller

Page 1: ...Installation and Operating Instructions CGLine Web Controller Target group Electrical specialists CGLine Web Controller...

Page 2: ...EENS 13 7 1 Home start screen 13 7 2 Start screen after registration 14 7 3 Overview of all faulty luminaires complete overview 15 7 4 Overview of all faulty luminaires for each zone 16 7 5 Overview o...

Page 3: ...each or 2 lines with max 400 luminaires each only with homogeneous installation of CGLine luminaires CGVision software Configuration and full visualisa tion of 32 x 800 luminaires Alternative Network...

Page 4: ...s policies O O Restrict Network Access Ideally CGLine Web Controller should be installed on a segregated net work However when the CGLine Web Controller is connected to a wider network make sure that...

Page 5: ...hnical regulations when set ting up and operating electrical operating equipment 5 1 Assembly Observe impermissible temperatures at the installation location during mounting The permissible ambient te...

Page 6: ...tional method O O Press the service pin 1 sec but 3 sec function test started for all luminaires O O Press the service pin 6 sec only new luminaires search started 1 6 7 8 9 10 2 3 4 5 3 Push buttons...

Page 7: ...Cable length line Cross section Length Total lines 0 5 qmm 260 m 660 m 1 0 qmm 520 m 1320 m 1 5 qmm 800 m 2000 m Table 4 Electrical data line Power supply bus 25 V Max permissible voltage drop 6 V Bus...

Page 8: ...ction enables connection of the CGLine Web Controller to a standard PC Controller functions can be programmed via the PC and a configuration software e g luminaire configurations The PC configuration...

Page 9: ...llowing screen is displayed 1 2 The following screen is displayed Mark the entry Internet protocol version 4 1 then con tinue with Properties 2 Usually the network card is on DHCP i e Automatically re...

Page 10: ...to the address bar The start screen of the CGLine Web Controller opens The screen shows an overview of the installed CGLine system with sum status information To have access to the submenus a login 1...

Page 11: ...ar In the submenu configura tion 1 It is possible to change the network set tings 1 6 5 Modifying of the language date and time To change the language to English please click on Configuration 1 in the...

Page 12: ...via the names is pos sible The CGLine Web Controller is supplied with a factory set static IP address of 192 168 1 200 3 Operation via DHCP is possible but in this case it is recommended to select st...

Page 13: ...Password GUEST 1 The Admin Account allows full access to the CGLine Web Controller e g start function test The User account allows only access for monitoring the status of the controller and connecte...

Page 14: ...Yellow min 1 lumi naire faulty O O Red min 3 luminaires faulty e g lamp failure After the login the navigation menu appears on the left side 1 O O Home The start screen is accessed via Home at any tim...

Page 15: ...le to enter to the building layout picture if it is prepared The menu Oveview 1 and the tab Overview luminaire failure 2 display all lumi naires with a fault 3 O O L line no 1 4 O O Z zone 2 16 O O B...

Page 16: ...r 40071860236 E February 2019 www eaton com 7 4 Overview of all faulty luminaires for each zone All luminaires with a fault in a zone are displayed in the Overview menu 1 and the Zone tab 2 Via the dr...

Page 17: ...erview luminaires 2 shows all installed luminaires on the CGLine Web Controller 1 2 7 6 Information information text of the luminaires This screen shows the name with max 20 char acters and informatio...

Page 18: ...of luminaires addresses For changing the configuration of luminaires addresses please follow the steps below 1 Click on the tab Luminaires The table with all the lumi naires installed appears 2 Click...

Page 19: ...uration tests are aborted O O Switch maintained mode ON OFF Luminaires in maintained mode L applied can be switched ON or OFF if luminaire supports this function O O Update luminaire status Actualisia...

Page 20: ...s On the Test tab 2 in the configuration menu 1 it is possible to deter mine start times for a function test and duration test for up to 8 groups It is also possible to set a test interval via which t...

Page 21: ...d mode luminaires of the line as long as the input is active O O Start function test With positive pulse starts the function test with all luminaires O O Stop FT DT Interrupts a duration test or funct...

Page 22: ...necessary after the commissioning to correctly set the date and time in the CGLine Web Controller here 5 2 1 4 5 3 7 13 Network settings Follwing settings are possible O O DHCP Dynamic Host Control Pr...

Page 23: ...plete logbook is downloadable via log book dat This file is only usable with the CGLine PC software see manual CGLine PC software The CGLine Web Controller contains an integrated e mail client 1 that...

Page 24: ...n layouts of the building or areas It is pos sible to import up to 30 building layout plans with max 200 luminaires each The colour of the luminaire shows the status e g red luminaire failure To use t...

Page 25: ...ing layouts can displayed now by the folder List of building layouts 1 With click on the name of the layout which is displayed as hyperlink with xml exten sion 2 the layout can load from the controlle...

Page 26: ...n there is a search function 1 2 This enables quickly finding any defective luminaires in a building To find a luminaire in the layout plan the line the zone and the luminaire to address can be select...

Page 27: ...entered here After confirming via Add the devices are automati cally created A device can be deleted from the list again via Delete 3 3 1 2 7 24 Overview all Web Controller With several installed CGLi...

Page 28: ...ht solution for the application But decision makers demand more than just innovative pro ducts They turn to Eaton for an unwavering commitment to personal support that makes customer success a top pri...

Reviews: