Figure 35. Securing the Rear Rail
Clip Nuts
5.
Repeat Steps 3 and 4 for the other rail.
6.
Tighten the assembly wing nuts on both rail assemblies.
CAUTION
The EBM is heavy (see page 139 ). Moving the EBM requires a minimum of two people.
7.
Place the EBM on a flat, stable surface with the front of the EBM facing toward you.
8.
If the mounting brackets are not already installed, align the two mounting brackets with the screw holes on
the side of the EBM and secure with the supplied 6-32 flat-head screws. ( See
).
9.
Attach the EBM front cover:
Align the pins on the rear of the front cover with the openings in the EBM. Push the cover firmly into place.
( See
).
Summary of Contents for BladeUPS none
Page 8: ...viii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Table of Contents ...
Page 12: ...xii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Figures ...
Page 14: ...xiv Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Tables ...
Page 20: ...6 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Introduction ...
Page 134: ...120 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Metering ...
Page 160: ...16420164914 164201649 14 ...