48
Eaton BladeUPS 5 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 14
Figure 33. Rail Screw Positions for the EBM Bottom Installation
Position 1
Position 6
Position 10
Position 15
First Rail
Second Rail
Rear Rail Screw Positions
(Installed at Bottom of Rack)
Front Rail Screw Positions
(Installed at Bottom of Rack)
Position 2
Position 4
Position 11
Position 13
First Rail
Second Rail
3.
Secure the rail to the front of the rack with two hex-head screws ( see
) .
Figure 34. Securing the Front Rail
4.
Using two clip nuts and two hex-head screws, attach the rail to the rear of the rack (see
and
).
The bottom rail uses positions 38 and 40 for the rear hex-head screws. If you are installing additional rails,
place the next rail 7 holes above the last installed screw.
Summary of Contents for BladeUPS none
Page 8: ...viii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Table of Contents ...
Page 12: ...xii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Figures ...
Page 14: ...xiv Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Tables ...
Page 20: ...6 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Introduction ...
Page 134: ...120 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Metering ...
Page 160: ...16420164914 164201649 14 ...