Figure 4. Inserting the Forklift Jacks
3.
Five and six UPS systems only.
Locate the battery cartons on the separate pallet (see
).
4.
If the battery pallet is not already moved, verify that the forklift or pallet jack you will use is rated to handle
the weight of the batteries and the pallet (see
for weight).
5.
Insert the forks of the forklift or pallet jack between the skids on either side of the pallet to move it.
WARNING
The forklift jacks must be inserted between the skids of the pallet (see
). If unloading instructions are
not closely followed, moving the batteries may cause serious injury.
6.
Use a forklift or pallet jack to move the battery pallet close to the installation area.
NOTE
Do not park the pallet in a location that will interfere with installing the system.
Summary of Contents for BladeUPS none
Page 8: ...viii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Table of Contents ...
Page 12: ...xii Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Figures ...
Page 14: ...xiv Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 List of Tables ...
Page 20: ...6 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Introduction ...
Page 134: ...120 Eaton BladeUPS 5 kVA to 60 kVA N 1 User s Guide 164201649 Rev 14 Metering ...
Page 160: ...16420164914 164201649 14 ...