Eaton BladeUPS 12 kVA Maintenance Bypass Cabinet Installation and Operation Manual P-164000130—Rev 1
www.eaton.com/powerquality
A-5
A.4
Maintenance Bypass Cabinet Distribution Configuration Options
There are 13 distinct Maintenance Bypass Cabinet (MBC) distribution configurations. Table A-2 lists and
describes the configuration options and identifies the figure diagram corresponding to that configuration.
NOTE
Subfeed breaker trip ratings must be specified at time of order. Maximum 225A trip.
Table A-2. MBC Configuration Options
Configuration and
PTE Number
480/208V
Transformer
SIB, RIB, MBB,
and UOB
225A 42-pole
Panelboards
LDB (Subfeed
Breakers)
Output Lug
Landings
Figure
Number
1
PTE06056BAS4200
x
x
2
—
—
2
PTE06056BAS4100
x
x
1
—
—
3
PTE06056BAS41LL
x
x
1
—
x
4
PTE06056BAS412A
x
x
1
2
—
5
PTE06056BAS413A
x
x
1
3
—
6
PTE06056BAS414A
x
x
1
4
—
7
PTE06056BAS40LL
x
x
—
—
x
8
PTE06056BAS402A
x
x
—
2
—
9
PTE06056BAS403A
x
x
—
3
—
10
PTE06056BAS404A
x
x
—
4
—
11
PTE06056BAS42LL
x
x
2
—
x
12
PTE06056BAS405A
x
x
—
5
—
13
PTE06056BAS406A
x
x
—
6
—