![Eaton BladeUPS none Installation And Operation Manual Download Page 62](http://html1.mh-extra.com/html/eaton/bladeups-none/bladeups-none_installation-and-operation-manual_3708108062.webp)
CRITICAL LOAD
PANEL BOARD B
FROM UPS
OUTPUT
SYSTEM
INPUT
PANEL BOARD A
CRITICAL LOAD
TO UPS
RECTIFIER INPUT
UOB
MBB
RIB
480V
SIB
208V
A-16
Eaton BladeUPS 12 kVA Maintenance Bypass Cabinet Installation and Operation Manual
P-164000130—Rev 1
www.eaton.com/powerquality
Figure A-13. Configuration 11 (PTE06056BAS42LL)
Summary of Contents for BladeUPS none
Page 65: ......
Page 66: ...164201690 4 P 164000130 1...