19
•
Tower mount:
Fasten the pedestal feet to the module by its sides, paying attention to the
module’s orientation, the LCD of themodule should be at the top (shown below).
With the gravity sensing feature, the LCD screen automatically rotates to the
correct orientation based on how the module is reployed.
3.3.2 EBM module installation:
•
Rack mount:
EBM module installation steps are the same as UPS.
Pay attention to this installation:
1.
EBM modules should be positioned beneath the UPS module (as shown
below).
2.
EBMs are required to be deployed in multiple of twos. Each module is 3U
high, therefore a minimum of 6U is required for EBM installation.
3.
EBM modules are heavy and requires at least 2 people to handle.