
18
2.
Install the mounting ears. Lock the left/right mounting ears into the UPS with
8pcs M4 flat screws (take note of the mounting ears sides and orientation
with the diagram below).
Note: There are 2 possible mounting positions for the mounting ears to suit
different depth requirements.
3.
Rest the module on the horizontal plane of the rail kit, slide it from the front
of the rack to the back till the mounting ears aligns with the vertical posts.
Secure the mounting ears to the vertical posts with 4pcs M5 screws +
washers (as below).