![Eaton 9SX 15K Series Manual Download Page 39](http://html1.mh-extra.com/html/eaton/9sx-15k-series/9sx-15k-series_manual_4262607039.webp)
39
1.
Input:
I. Connect the main-ground cable (PE) to the chassis
II. Bridge the
‘AC input terminal N/N/N’ with ‘busbar #3’
III. Connect the AC main source cable (N), and bypass source cable (N) to the
aforementioned N/N/N terminal busbar #3
IV.
Connect the ‘AC input terminals mL1/mL2/mL3’ to the main source cable
(L1/L2/L3)
V.
Bridge the ‘AC input terminal bL1/bL2/bL3’ with ‘busbar #12’, then connect the
bypass source cable (L) to it
2.
Output:
I. Connect the ground cable (PE) to the chassis
II. Bridge the
‘AC segment terminal N/N/N’ with ‘busbar #3’, then connect the AC
cable (N) to it
III.
Bridge the ‘AC segment terminals L1/L2/L3’ with ‘busbar #3’, then connect the
AC cable (L) to it
3.
Connecting to UPS 1 and UPS 2:
I. Remove all busbars of the UPS
II. Connect UPS 1 and UPS 2
to the MBP with ‘Cable to UPS 1’ and Cable to UPS
2’ included in the MBP’s accessory
Summary of Contents for 9SX 15K Series
Page 1: ...1 Eaton 9SX 15 20K Series Maintenance ByPass MBP MBP20K MBP20KPDU MBP20KPARA...
Page 2: ...Copyright 2020 EATON All rights reserved...
Page 50: ...50...
Page 53: ...53 Appendix 1 System block diagram...
Page 55: ......
Page 56: ...614 40048 00...