Use the procedures in the following paragraphs to connect the various interface connections.
lists all of the available (if installed) interface and control wiring topics, install each based on customer request
and options ordered with the UPS.
Table 20. List of Interface and Control Wiring Connection Topics
If wiring:
Proceed to:
Building Alarm and Relay
Contact Connections
Installing Building Alarm and Relay Contact Connections
Sidecar MIS and RIB Breaker
Monitoring Connections
Sidecar MIS and RIB Breaker Monitoring Connections
Battery Detect Connections
Installing Battery Detect Interface Connections
Battery Shunt Trip and Battery
Aux Connections
Installing Battery Shunt Trip and Battery Aux Interface Connections
Bypass Shunt Trip Connections
Generator Interface
Connections
Generator Interface Connections
External Parallel CAN Control
Wiring and Connections
External Parallel CAN Control Wiring and Connections
External Parallel Pull Chain
Control Wiring and
Connections
External Parallel Pull Chain Control Wiring and Connections
Minislot Interface Connections
Installing Minislot Interface Connections
REPO (Remote Power Off)
Switch Connections
44..66..11
IInnssttaalllliinngg B
Buuiillddiinngg A
Allaarrm
m aanndd R
Reellaayy C
Coonnttaacctt C
Coonnnneeccttiioonnss
NOTE 1
If installing interface wiring connections between standalone cabinets or separate
devices, conduit must be installed between each cabinet or device.
NOTE 2
Disconnect terminal block plugs from terminal blocks to wire plugs.
To install wiring:
1.
Verify the UPS system is turned off and all power sources are removed. See
Chapter 6
UPS Operating
Instructions
, for shutdown instructions.
2.
If not already opened, open the front door by lifting the latch from the bottom and turning to the right
(counterclockwise) and swing the door open.
3.
If wiring the interface terminals from the bottom of the UPS, proceed to
Step 8
; otherwise, proceed to
Step 4
.
4.
Top Entry Wiring.
Remove the top interface entry conduit landing plates to drill or punch holes (see
,
, or
).
5.
Reinstall the interface entry plates and install the conduit.