72
Eaton 93PM-L 20–200kW (208V) UPS Installation and Operation Manual 164000724—Rev 01
20. Remove the Top Strap, the Back Strap and the Base Strap that are secured to the Wireway’s left Front
Corner post, and retain the hardware.
21. With the Wireway located near the UPS cabinet,
lower the Wireway’s four leveling feet evening till the
casters are not in contact with the floor.
22. Remove the Wireway’s four caster outriggers, see
and recycle the outriggers and bolts in a
responsible manner.
Figure 14. Wireway Caster Outriggers
Wireway
Caster Outrigger
(2 places left side)
(2 places right side)
23. Remove the UPS cabinet’s right Front Corner Post, see
, recycle the hardware in a responsible
manner.
Summary of Contents for 93PM-L IAC-B
Page 162: ...16400072401 164000724 01 ...