76
Eaton 93PM-L 20 – 60 kW (208V) UPS Installation and Operation Manual P-164000711—Rev 03
6.
Route the UPS building alarm and relay output interface wiring through the top interface entry conduit
landing plates to the UPS building alarm and relay output terminals. See
and
for UPS
interface terminal locations.
7.
Proceed to
Step 13
.
8.
Bottom Entry Wiring.
Remove the bottom interface entry conduit landing plates to drill or punch holes
(see
9.
Reinstall the interface entry plates and install the conduit.
10. Route the UPS building alarm and relay output interface wiring through the bottom interface entry conduit
landing plates to the bottom access interface wiring channel along the inside of the front door.
11. Route the wiring along the interface wiring channel.
12. Secure the wiring to the wire tie anchors provided (see
) using Zip ties.
13. Connect the building alarm interface wiring to the building alarm terminals. See paragraph
UPS System Interface Wiring Preparation
and
for wiring and termination requirements, and
for terminal assignments.
14. Connect the relay output interface wiring to the relay output terminals. See
for wiring and
termination requirements, and
for terminal assignments.
15. If wiring additional interface or control wiring options, see
for next option to install; otherwise,
proceed to
Step 16
.
16. Close the UPS outside door and secure the latch.
Summary of Contents for 93PM-L 60-1
Page 4: ......
Page 164: ...P 16400071103 P 164000711 03 ...