Eaton 93E External Battery Cabinet Installation Manual P-164000057—Rev 05
33
ground terminals. Refer to the applicable Eaton 93E UPS Installation and Operation manual listed in
paragraph
for UPS cabinet terminal locations and termination requirements.
19. Connect the positive, negative, and ground power wiring to the UPS cabinet external battery input and
ground terminals. Refer to the applicable Eaton 93E UPS Installation and Operation manual listed in
paragraph
for UPS cabinet termination requirements.
20. If installing a second EBC, proceed to
; otherwise, proceed to
21. Route the battery cables (positive, negative, and ground) through the EBC 2 power terminal cover base
wiring channel (see
) to the UPS DC and ground terminal blocks on EBC 2. See
or
for wiring access information and terminal locations. See paragraph
, and
for wiring and termination requirements.
22. Connect the positive and negative power wiring to the UPS DC (+) and UPS DC (-) terminals on EBC 2.
Connect the ground wiring to the ground terminal on EBC 2. See
or
23. Route the other end of the battery cables (positive, negative, and ground) through the EBC 1 power
terminal cover base wiring channel (see
) to the DC IN and ground terminal blocks on EBC 1. See
or
for wiring access information and terminal locations. See paragraph
, and
for wiring and termination requirements..
24. Connect the positive and negative power wiring to the DC IN (+) and DC IN (-) terminals on EBC 1. Connect
the ground wiring to the ground terminal on EBC 1. See
or
.
25. Secure the DC battery cables to the bottom of the power terminal cover base using wire ties after all
electrical connections have been completed.
26. Install the power terminal cover tops using the provided hardware (see
).
27. Install the EBC left side power terminal cover and the UPS right side power terminal cover using the
provided hardware (see
28. Install the splice cover using the provided hardware (see
).
29. Proceed to
30. Install the right and left side power terminal covers using the provided hardware (see
NOTE
Internal battery strings are to be connected by an authorized Eaton Customer Service
Engineer at system startup.
31. Once the battery cabinets are installed and wired, return to the applicable Eaton 93E UPS Installation and
Operation manual listed in paragraph
to complete the UPS wiring.