
10. You can test the relays by selecting any of the options in the test mode
Figure 36. Relays
1
Cable exit opening for up to 12 mm (½”)
conduit
3
K1 thru K5 terminal connections for relay
contacts to operator's monitoring
equipment
2
Signal input connector with voltage supply
Eaton 91PS/93PS UPS 8–40 kW
User's and installation guide
©
Eaton Corporation plc 2018. All rights reserved.
Revision: 005
Document ID: P-164000493
80 (117)