10.4 Parallel operations
Start-up:
NOTE
Before start-up make sure that UPS installations have been carried out correctly and ground
connections of both UPS units and parallel module have been connected. Check also that the
XSlot Hot Sync cards are installed correctly and the communication line between UPSs is
connected according to figure Communication cabling wiring.
When installation is completed correctly the start procedure can be started.
NOTE
If some settings are changed from User settings the same changes need to be done separately
to all of the UPSs in the system.
Carry out the following procedure to each UPS you want to have in system:
1.
Turn the battery and input circuit breakers to ON position.
2.
UPS will enter a stand-by mode and starts to charge batteries with a cooling fan operational.
Output is without the voltage in the stand-by mode.
3.
Push any key of the control panel to enable the functions of the LCD screen.
4.
Select unit number in parallel system: Unit #1, Unit #2, Unit #3 or Unit #4. Select: SETTINGS ->
USER SETTINGS -> PARALLEL OPERATION SETTINGS -> PARALLEL UNIT NUMBER.
5.
Select minimum units to support load: 0-4. Select: SETTINGS -> USER SETTINGS -> PARALLEL
OPERATION SETTINGS -> MINIMUM UNITS TO SUPPORT LOAD Do the following item (item
6) only for one UPS, which belongs to the system.
Do the following item (item 6) only for one UPS, which belongs to the system.
6.
Return to main menu and select TURN SYSTEM ON.
All the UPSs shall check their internal functions, synchronize to bypass and start to supply the
load.
NOTE
After the first start the load sharing of the system needs to be calibrated. Before starting
the calibration the system needs to support some load.
7.
Select: SETTINGS -> USER SETTINGS -> PARALLEL OPERATION SETTINGS -> START AUTO
CALIBRATION.