Product information
Introduction
Eaton’s Cooper Power™ series loadbreak elbow connector
is a fully-shielded and insulated plug-in termination for
connecting underground cable to transformers, switching
cabinets and junctions equipped with loadbreak bushings.
The elbow connector and bushing insert comprise the
essential components of all loadbreak connections.
Read this manual first
Read and understand the contents of this manual and follow
all locally approved procedures and safety practices before
installing or operating this equipment.
Additional information
These instructions cannot cover all details or variations
in the equipment, procedures, or process described nor
provide directions for meeting every possible contingency
during installation, operation, or maintenance. For additional
information, contact your Eaton representative.
Acceptance and initial inspection
Each loadbreak elbow is in good condition when accepted
by the carrier for shipment. Upon receipt, inspect the
shipping container for signs of damage. Unpack the elbow
and inspect it thoroughly for damage incurred during
shipment. If damage is discovered, file a claim with the
carrier immediately.
Handling and storage
Be careful during handling and storage of the loadbreak
elbow to minimize the possibility of damage. If the elbow
is to be stored for any length of time prior to installation,
provide a clean, dry storage area.
Standards
ISO 9001 Certified Quality Management System
Figure 1. Line illustration of 200 A 35 kV Class elbow.
TEST POINT
(OPTIONAL)
LOCKING RING
THREE-PHASE
PROBE
INSULATED
CUFF
ARC
FOLLOWER
PULLING
EYE
TEST
POINT
CAP
DRAIN
WIRE TAB
LOADBREAK
BAND
PEROXIDE-CURED
SEMI-CONDUCTING SHIELD
INSULATION
ENCAPSULATED
CONDUCTIVE
INSERT ENDS
PEROXIDE-CURED
SEMI-CONDUCTING INSERT
PEROXIDE-
CURED EPDM
INSULATION
WARNING
All associated apparatus must be de-energized during
any hands-on installation or maintenance. Failure to
comply may result in death, severe personal injury and
equipment damage.
CAUTION
The 200 A loadbreak elbow connector is designed to
be operated in accordance with normal safe operating
procedures. These instructions are not intended to
supersede or replace existing safety and operating
procedures. The elbow connector should be installed
and serviced only by personnel familiar with good
safety practices and the handling of high-voltage
electrical equipment.
CAUTION
Optional Capacitive Test Point Operating Instructions:
Use only voltage indicating instruments specifically
designed for test points. Use of conventional voltage
sensing devices may provide false “No Voltage”
indications.
The test point must be dry and free of contaminants
when checking for voltage. After indication is taken:
clean, dry, and lubricate the test point cap with silicone
grease and assemble to the test point.
Always consider the termination to be energized until
the test point “No Voltage” indication is confirmed by
other means.
CAUTION
Elbows with tan cuffs (QuickMake probe) must be
mated only with 21.1 kV 1Ø rated bushings (identified
by tan nose pieces). Elbows with purple cuffs (3Ø
probe) must be mated only with 21.1/36.6 kV 3Ø rated
bushings (identified by purple nose pieces).
1
200 A 35 KV CLASS “LE” SERIES ELBOW INSTALLATION INSTRUCTIONS
MN650010EN May 2015