Figure 4-2. UPS with Model 1085 or 1085HR Battery Cabinet
1.
Verify that the UPS is properly installed and secured. Refer to the applicable Power Xpert 9395 UPS
Installation and Operation manual listed in paragraph 1.7 for UPS cabinet conduit and terminal
specifications and locations.
2.
Roll the battery cabinet to the area where the battery cabinet is to be installed.
3.
Secure the battery cabinet position by lowering the leveling feet until the cabinet is not resting on the
casters and the cabinet is level.
4.
Remove the cosmetic cover and hanger brackets from the appropriate side or sides of the battery
cabinets, depending on the position of the cabinets. Save covers, screws, and brackets for later use.
5.
Roll the next battery cabinet to be joined to an area near the appropriate side of the first battery cabinet.
6.
Push the battery cabinet to be joined towards the first battery cabinet until the doors are flush with each
other.
NOTE
When multiple battery cabinets are ordered for standalone installation, the first
battery cabinet is supplied with two cosmetic covers. Additional battery cabinets are
supplied without cosmetic covers.
t