Page | 4
PRE-INSTALLATION REQUIREMENTS:-
Main Door opening: -
Please ensure that the entrance of main door to the building as well
as the entrance of user/lab room should have a minimum clearance of 4 feet (W) & 7 feet (H)
to take the equipment inside.
Electrical requirement: -
15 Ampssingle phase 3pin socket with 16 MCBsbreaker made of
good quality IS standards with proper earthing to avoid loose contact.
Ventilation
:- The room where the equipment has to be installed should have adequate
crossventilation with large windows on two sides of the room so as to maintain ambient of
30°C to 10°Cair conditioned room.
GENERAL CONSTRUCTION
Interior is made of GIPP.
Exterior of CRC Powder Coated.
Non-CFC, high density, high temperature performance, six side of body withPUF 125mm
insulation.
Double foaming PUF insulated door, hinged main door with Door lock and Double circuit of
PU gaskets to prevent any air seepage.
Mounted on heavy-duty ball bearing castor wheels for smooth movements with lock.
Working temperature is from -40°C to -80°C (Control Accuracy ± 5°C)
REFRIGERATION:
Non-CFC Hermetically sealed compressors.
Non-CFC eco-friendly HFC refrigerants (mixture).
Copper cooling coils 99.97% purity on all sides of chamber.
External Fan motor condenser cooling fan.
CONTROL PANEL & ELECTRICAL:
Microprocessor Dual Display Controller.
Audio-visual alarms for High/Low temperature deviations.
Electronic interlock between pressure switch and Solenoid Valve.
Volt & Ampere Digital Indicator
High & Low Voltage & High Ampere safety cutoff for the compressor.
INSTALLATION & PRE COMMISSIONING CHECKS
The chamber is commercially packed and transported in a reasonably upright position.
It must not be carried on its back, front or side. To do this would strain the refrigeration
mount.
The chamber is completely assembled and tested at EASYCOOL REFRIGERATION prior to
shipment.