To order parts and supplies: 800.343.9353 >> eastwood.com
7
1.
Using a 19mm wrench (not Included) remove Locknut, Washer and
Crank Handle from the upper end of the Jackscrew and set aside
for reinstallation
(FIG 9)
.
2.
Remove two M6 x 20 Screws, Washers & Locknuts in the Jack-
screw Guide Bracket with two 10mm wrenches (not included) and
set aside for reinstallation.
3.
Secure the Jackscrew Guide Bracket to the Tab on the Post of the
Support Arm “Tee” Beam with the previously removed M6 x 20
Screws, Washers & Locknuts and secure with two 10mm wrenches
(not included)
(FIG 10)
.
4.
Replace the Crank Handle over the flats on the end of the
Jackscrew with the Handle upward and secure with the M12 Nut
and Washer. Tighten securely with a 19mm wrench (not included)
(FIG 11)
.
5.
Turn the Crank as needed to raise or lower the Support Arm “Tee”
Beam
[D]
as needed to align the nearest of the 7 through holes with
the through hole in the Spindle Post [A] then insert the previously
removed Lock Pin, Washer and Clip.
6.
At this point the assembly should appear as in
FIG 12
.
FIG. 9
FIG. 10
FIG. 11
FIG. 12