Eastsign
24
9.2.7Rollerreplacement-Toprollerreplacement
-Takeofftherightsidecover
-Removetherelevantconnectorsorwiring(heater,liftmechanical
kits)bothinsideoftheleftandright
-Removethetoprollerblindplateontheleftframe
-Takeawaytoproller
-Replacethenewrollerandinstallitaccordingtotheprevioussteps.
-Attention:Aboveinformationisforreferenceonly,followedby
manufacturer’sinstructionisneededifsomethingincorrector
wrong.Poweroffismustbewhileroller’sreplacementforsafety
purpose.
9
.
3
Cleaning
9.3.1Toextendthelifetimeofthemachines,pleaseensurethemachine
areclean.
9.3.2Makesureenvironmentcleanandkeepawayfromobstacles.
9
.
4
Checking
Inordertoensureyoursafety,pleasecheckthesafetyofthemachine
regularly.Ifyoufindfailuresinthecheck,pleaserefertothesectionof
Troubleshootingandsolution.Ifyouneedtoresetthepressure,please
refertothesectionofPressuresetting.
9
.
4
.
1
V
isualchecking
-Visualcheckingpriortomaintenance.
-Powersupplecableundamaged.
-Casterisstable.
-Anydamageonmachine
.
M
A
IN
T
E
N
A
N
C
E