9
B+G e-tech GmbH Fr.-Mehring St. 36 DE 01979 Lauchhammer
Fax: 0049 3574 4675519 Web: www.eastron-germany.de
2-4
After setting the last digit, SET will show.
Press
to exit the number setting routine and return to the Set-up menu. SET will be
removed
DIT Demand Integration Time
This sets the period in minutes over which the current and power readings are integrated for
maximum demand measurement. The options are: 0, 5, 8, 10, 15, 20, 30, 60 minutes
1
From the set-up menu, use
and
buttons to select the DIT option.
The screen will show the currently
selected integration time.
2-1
Press
to enter the selection
routine.
The current time interval will flash
2-2
Use
and
buttons to
select the time required.