
- 3 -
II. PANEL DESCRIPTION
(fig. A)
III. OPERATING INSTRUCTIONS
A. GENERAL MEASUREMENT PROCEDURES
1. Attached the
BNC PLUG
(A11) to the
BNC SOCKET
(A10).
2. Attached the
MINI PLUG
(A12)
to the
INPUT SOCKET
(A13).
3. a. Acceleration (ACC) Measurement:
Switch the
ACC/VEL SELECTOR
(A7) to the "ACC" position.
b. Velocity (VEL) Measurement:
Used for general industrial vibration. Switch the
ACC/VEL
SELECTOR
(A7) to the "VEL" position.
4. Switch the
RMS/PEAK SELECTOR
(A4) to the "RMS" position.
5. Press the
POWER BUTTON
(A2) once to turn on the meter.
1. DISPLAY
2. POWER BUTTON
3. HOLD BUTTON
4. RMS/PEAK SELECTOR
5. RECORD BUTTON
6. RECALL BUTTON
7. ACC/VEL SELECTOR
8. BATTERY COVER
9. RS232 OUTPUT TERMINAL
10. BNC SOCKET
11. BNC PLUG
12. MINI PLUG
13. INPUT SOCKET
14. VIBRATION SENSOR
15. MAGNETIC BASE
9
2
5
11
12
13
14
15
10
1
4
3
7
6
8
www.eastern-energy.net
Email: [email protected]
www.eastern-energy.net