-8-
Fig. 2.4.2 Schematic diagram of DC48V tower battery connection
Fig. 2.4.2 Schematic diagram of DC24V rack battery connection
Fig. 2.4.2 Schematic diagram of DC48V rack battery connection
2.4.3 Installation
1. This product shall be installed by professionals. The provided power cord can
be B connected to the wall socket to serve as UPS input power.
2. Before the use of UPS, the battery shall be charged for more than 8 hours.
UPS will charge the battery automatically as long as it is connected to the utility
power line.
3. Installation of rack UPS.
-9-
Vertical installation
Combine the connecting extensions and RT foot pieces among the accessories into
two racks according to the following figure. Align the racks at a proper distance and
place them on the plane in parallel.
Fig. 2.4.3 Assembly diagram of foot pieces
Keep the machine upright and put it on two racks. Do not turn upside down.
Fig. 2.4.3 Vertically positioned UPS
Rack installation
Fasten the rack parts among the accessories to both sides of the chassis with
screws (as shown below).
Connecting
extension
RT foot piece
Placed in parallel