Set Days to Regenerate
This setting is a default or holiday setting
on meter softeners. If you have not
used enough water and the machine has not regenerated on the meter setting, it will
automatically regenerate after a set number of days have elapsed. If the default is
set at 10 and you are away on holiday, for example, 10 days after the last
regeneration the machine will clean itself automatically. This will ensure you have full
capacity on your return.
To set, press the set button and with the number flashing, use the up arrow until the
desired number of days is displayed.
The following is now displayed;
Press the set button again to advance to the next setting.
A number with kg will appear on the display.
Press the set button again to advance to the next setting.
Setting the hardness
Press the set button. The display will now start to flash. Use the up or down arrows to
advance the incoming hardness. Once the display reads the required number, press the
set button.
The display will revert to capacity left in cubic meters (m3) and capacity left
before the next regeneration in litres per minute (lpm)
Once you are satisfied that the machine is both plumbed in and set up correctly, the machine will
need to be commissioned.
Commissioning the unit.
Press and hold the regenerate button (4). You should hear the cam rotate and the
following display will appear. The machine will now perform a regeneration. This initial
process will take up to 72 minutes to complete. Once this operation is complete, the
unit will supply your property with soft water.
Manual Regeneration.
The unit can perform two different types of manual regeneration, either immediately or delayed.
Delayed Regeneration.
Press the regeneration button once. The symbol will appear and flash on the display. A single
regeneration will start at 2am (preset regeneration time). If you wish to cancel this delayed
regen, simply press the regeneration button again and the symbol will disappear from the
display.
Immediate Regeneration.
To perform an immediate regeneration, follow the procedure for commissioning the unit (as
above).
Regeneration button
10
Initial programming of your water softener (continued)