![EAS EMH750CGB Manual Download Page 44](http://html.mh-extra.com/html/eas/emh750cgb/emh750cgb_manual_521803044.webp)
18
V.
2
■ A full operational test and a test for possible leakages
must be carried
out by the fitter after installaion.
■ The flexible hose shall be fitted in such a way that it
cannot come into
contact with a moveable part of the ho
using unit and does not pass
through any space susceptible of becoming congested.
Grease cranes produced at the factory to meet the
requirement of all life hob.
■
positioning
EMH750CGB
400mm
560mm
490mm
400mm
700mm
Min.
FO 0812
CLEARANCES REQUIRED
WHEN FITTING THE HOB
WITHOUT A COOKER HOOD ABOVE
FO 0813
400mm
560mm
490mm
400mm
700mm
0
in.0mm
CLEARANCES REQUIRED
WHEN FITTING THE HOB
WITH A COOKER HOOD ABOVE
60mm
60mm
750mm
200mm
M2