Installation
Ensure the power has been turned off before beginning this
installation. Plug must be assembled in places easy to drag
and insert .
1.
Remove the range hood
from the carton.
2.
Lay the hood upside down
on a table covered with card-
board or paper to prevent
scratching of the table or hood.
3.
Hood installation should be
within 0.6m radius range.
4.
We recommend that after
installation the bottom of
the hood should be no less
than 650mm and no more
than 750mm above the
stove’s heating elements
and burners.
Installation work and electrical wiring must be done
by qualified person(s) in accordance with all applicable
codes and standards, including fire rated construction.
To install this hood you will
require two assistants. You will
need the following tools and
material to complete this insta-
llation:
Drill
Flat head screwdriver
Phillips head screwdriver
or cordless drill and Phil-
lips head bit
Tin snip
Measuring tape
Hand saw or jig saw
Electrical tap
e
Duct tape
Information
5
V.5