Content
1.Safety precautionary measure
2.Key points in installation inspection
3.Installation of outdoor unit
4.Connecting pipe installation
5.Electrical wiring
6.Trial running
22
16
8
3
1
2
The equipment contains fluorinated
Greenhouse gas R410A
Global Warming Potential(GWP):2087.5
V.2