background image

Assembly and Operation Instructions 

 

EarthWay 2600A-Plus_12-3

 

PAGE 4 

 

 

 

 

 

 

 

 
 
13.  Insert agitator to pinion shaft on inside of hopper.  

NOTE:

 Position of flat side 

of the agitator as shown at the right.  
 
 
 

OPERATING INSTRUCTIONS

 

Before filling hopper, become familiar with the operation of this spreader.

 

1. 

Obtain proper setting for material to be used from the RATE SETTING MATRIX included with this spreader.

 

2. 

Move stop bolt on rate gauge assembly to the proper setting for the material that you are spreading.

 

3. 

While pushing spreader forward, pull the Control Lever back to stop bolt.

 

4. 

To stop, push lever forward to close flow holes before you stop moving.

 

5. 

When finished, empty any remaining material from hopper.

 

6. 

Thoroughly wash spreader and allow to dry before storing.  Spray all metal surfaces (inside & outside) with WD40 
or other light oil to help prevent corrosion.

 

 

 
 
 
 
 

11.  Using ½” Carriage Bolt, install through the Control Rod, Linkage and  

install the Flat Washer and secure with Hex Nut to a loose fit to allow for 
CALIBRATION below.  See above, right, and below for details.   
 

12.  

CALIBRATION:

  THIS STEP ENSURES THAT YOUR SPREADER IS PROPERLY 

ADJUSTED TO GIVE YOU A CORRECT STARTING POINT TO APPLY MATERIALS AT 
THE CORRECT SETTING.  Pull the Control Lever back to #30 on the Gauge, then 
push the shut-off plate forward until the shut-off and the drop holes are full 
op

en.  Now tighten the Hex Nut on the ½” Carriage Bolt on the Linkage 

Assembly.  Check to confirm calibration by closing the Control Lever, then 
reopening to #30 and confirm that the drop holes are fully open. 
 
 

Reviews: