EarthWay 2170-XL Assembly Instructions Manual Download Page 4

Assembly and Operation Instructions 

 

2170_M52164_RevJune2021

 

PAGE 4 

Step 6: 

Places the bearings into the lower frame 

using the “notch” on the bearing to fit into the 
“notch” on the LOWER AXLE FRAME.   Next slide the 
axle through the bearings, through the GEAR BOX 
and into the other LOWER AXLE FRAME.  Next, install 
AXLE BUSHING onto the axle, by placing the smaller 
end in first, slide over the AXLE, past the drilled 
holes.   

 

 

 

NOW GO BACK AND TIGHTEN ALL NUTS AND BOLTS STARTING WITH FIRST STEP. DO NOT OVER TIGHTEN. 

Step 7: 

Install DRIVE WHEEL onto the AXLE and align 

with the cotter pin hole nearest to LOWER HANDLE as 
shown. Insert 2″ cotter pin through wheel and through 
AXLE. Bend with pliers to prevent pin from falling out. 

Step 8: 

Install COAST WHEEL onto the AXLE fully, then 

using outside cotter pin hole, insert 1″ cotter pin through 
AXLE (

not thru the wheel

). Bend with pliers to prevent 

pin from falling out. 

 

 

 

Step 9: 

New for 2021 EarthWay listened to customers who desired an adjustable handle for taller operators. 

Select three ¼” x 2” bolts and three nylon lock nut to complete this step.   

Notice that the square handle shaft has two sets of holes in both ends.  The end that the holes are closest to the end 
of the handle shaft is the top.  Place it as shown inbetween the handles.  

Start by bolting through the handle spacer using the top most handle bar hole.  Then bolt the gauge & lever assembly 
through the two center holes using two of your ¼” x 2” bolts.   

TIGHTEN ALL HARDWARE.

 

Summary of Contents for 2170-XL

Page 1: ... and position the left wheel 6 12 from your sidewalk or border While activated the spreader will not waste fertilizer like competitor designs Competitor deflectors leave 7X the fertilizer inside the wheels from blocking all the material leaving the impeller ASSEMBLY HARDWARE ASSEMBLY HARDWARE ASSEMBLY HARDWARE ASSEMBLY HARDWARE SPREADER COMPONENTS SPREADER COMPONENTS SPREADER COMPONENTS SPREADER C...

Page 2: ...d flow rate Do not use powdered materials as it will damage the gearbox Gears are permanently lubricated at the factory Do not open the GEARBOX or dirt may enter IF YOUR SPREADER COMES SEMI ASSEMBLED SKIP TO STEP 7 SPREADER ASSEMBLY INSTRUCTIONS Step 1 Remove all components and hardware items from the box Place the spreader hopper upside down and facing away from yourself Step 2 Install FRAME usin...

Page 3: ...t through hole in LOWER HANDLE and through hole in FRAME install locknut DO NOT TIGHTEN B Now insert 1 bolt into the hole in LOWER HANDLE then through FRAME brace Next into threaded connector in CROSS BRACE DO NOT TIGHTEN NOTE Numbers on frame brace must be facing toward gear box as shown C Install the FOOT into the FRAME and align the bolt holes in the FOOT and the FRAME a Phillips screwdriver or...

Page 4: ...r pin through wheel and through AXLE Bend with pliers to prevent pin from falling out Step 8 Install COAST WHEEL onto the AXLE fully then using outside cotter pin hole insert 1 cotter pin through AXLE not thru the wheel Bend with pliers to prevent pin from falling out Step 9 New for 2021 EarthWay listened to customers who desired an adjustable handle for taller operators Select three x 2 bolts and...

Page 5: ...Assembly and Operation Instructions 2170_M52164_RevJune2021 PAGE 5 TALL OPERATOR CONFIGUATION with the four handle holes use the bottom two holes for the guage and use the top hole for the spacer ...

Page 6: ...d of the PIVOT ROD through the back of the PIVOT ROD BRACKET as shown see below Step 12 Install HANDLE SHAFT to LOWER HANDLEs and PIVOT BRACKET assembly as shown Using 2 bolts and locknuts TIGHTEN BOLTS AND NUTS NOW Step 13 Install flattened end of CONTROL ROD in to LEVER on GAUGE as shown Turn to lock in place Next push LEVER forward to setting 0 Align CONTROL ROD with hole in PIVOT BRACKET pull ...

Page 7: ...G 30 ON THE FLOW CONTROL LEVER MUST PLACE THE SHUT OFF PLATE IN THE FULL OPEN POSITION TO BE PROPERLY CALIBRATED Now tighten the nuts against the PIVOT BRACKET to prevent change in calibration NOTE Tension on the flow control lever may be adjusted by tightening or loosening the tension nut as shown Step 16 Insert agitator to pinion shaft on inside of hopper Note the position of flat side of the ag...

Page 8: ...he control rod at the pivot bracket shown A If your shut off is not able to open fully as in step 1 Loosen the top nut a few turns then loosen the lower nut so that it allows you to push the shut off open fully Next tighten each nut so that they contact the pivot bracket without moving it and then carefully tighten each nut fully so they do not loosen during use Recheck adjustment as outlined in 1...

Page 9: ...as normal 4 When you have completed this spreading pass close the control lever to 0 and then open the SideSpred Control by sliding the control lever from back to the front for a FULL 180 degree spread pattern CUSTOMER SERVICE SUPPORT EARTHWAY COM www EARTHWAY com 1009 Maple Street Bristol IN 46507 ONE YEAR WARRANTY EarthWay Products Inc warrants this product free of defects in original workmanshi...

Page 10: ... 40003 SQUARE SCREEN 8 60175 OPERATOR T HANDLES 2 60335 HOPPER ASSEMBLY KIT 2 1 2 6 9 60333 GEARBOX IMPELLER SHAFT KIT 9 1 9 2 3 38144 HARDWARE KIT 3 1 3 92 10 12110 IMPELLER 4 60260 CONTROL KIT X BRACE KIT 4 1 4 5 11 70138 13 PNEUMATIC TIRE 5 60603 LOWER FRAME ASSY KIT 5 1 5 6 4 3 60298 GAUGE LEVER ASSEMBLY 6 25222 HANDLE TO FRAME AXLE ARMS 6 1 6 2 12 F77130 HEAVY DUTY RAIN COVER ACCESSORY 7 2522...

Reviews: