ACM-22CP-IM (05/13)
Page 9
Installation – Electrical and Start-Up
1. After turning “OFF” power to all EarthLinked
®
and field supplied system components at the
appropriate breakers
remove the Auxiliary Cooling Module control box access panel.
2. Connect appropriately sized line voltage wires and ground wire to the Auxiliary Cooling
Module, as shown in Figure 5.
Figure 5. Auxiliary Cooling Module Field Wiring
3. The Auxiliary Cooling Module contains a pressure actuated fan speed control that has been
factory set for a pre-determined R-22 system condensing pressure.
4.
Check all wiring and electrical connections to ensure proper routing and good
contact
before restoring electric power, evacuating and recharging system in accordance
with the current EarthLinked
®
system installation manual.